Project intelligenceTDLR TABS2026014956Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

CSW Industrials Expansion

5420 LBJ Freeway Suite 500, Dallas, TX, 75240

Target date passed (Jul 2026)Review Complete

CSW Industrials Expansion is a renovation/alteration project at 5420 LBJ Freeway Suite 500, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 16,877 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,877 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$73/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 13, 2026133 days across supplied datesJul 24, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    109 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About CSW Industrials Expansion

A tenant improvement project at 5420 LBJ Freeway Suite 500 in North Dallas is registered under the name Lincoln Centre Two. The filing identifies the work as a renovation and alteration with an estimated cost of $1,238,414. The scope covers 16,877 sq ft of space on private land for private use.

Tiaa is listed as the owner of record for this project. Entos Design serves as the registered design firm. Fred Dean Shinault is the registered accessibility specialist associated with the filing. The project is privately funded and located in Dallas County.

Construction Timeline and Status

Plan review was completed in March 2026. Construction was scheduled to begin in April 2026 with a completion date of July 2026. The TDLR record shows the status as Review Complete. The public record has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

The estimated cost of $1,238,414 places this project above the county median for renovation and alteration filings in Dallas County. The median estimated cost for this type of work is $249,000. The cost per square foot is $73, which is close to the county median of $72. The scheduled build window of 109 days is close to the county median of 92 days.

Tiaa has six other TDLR-registered projects totaling $1,407,911. These include Lincoln Centre Two, Two Lincoln Centre, Lincoln Centre Three, and Lincoln Center III, all located in Dallas. Entos Design has six other registered projects totaling $2,357,187, including 1900 Pearl, Park Place on Turtle Creek, and Tollway Center.

The site is in North Dallas, near the Hilton Dallas Lincoln Centre by the Galleria and Target. Other registered renovation projects in the area include Heritage Square I, Galleria Dallas, and Providence Towers. The ZIP code 75240 has a population of about 24,718 and a median household income of $56,056 according to U.S. Census ACS 2023 estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75240 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

CSW Industrials Expansion is a Renovation/Alteration project located at 5420 LBJ Freeway Suite 500, Dallas, TX 75240 in Dallas, Texas. The project has an estimated value of $1.2M covering 16,877 sq ft. TIAA is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on March 13, 2026.

Frequently Asked Questions

What is the estimated cost of the Lincoln Centre Two project?

The estimated cost for the tenant improvement at 5420 LBJ Freeway Suite 500 is $1,238,414. This figure is from the TDLR registration filing for the renovation and alteration work.

Who is the owner of the Lincoln Centre Two project?

Tiaa is listed as the owner or developer of record. Entos Design is the registered design firm, and Fred Dean Shinault is the registered accessibility specialist.

Has the Lincoln Centre Two project finished construction?

The filing lists a completion date of July 2026. However, TDLR has not yet recorded a final inspection. The public record does not confirm the current state of the site.

Where is the Lincoln Centre Two project located?

The project is at 5420 LBJ Freeway Suite 500 in Dallas, TX 75240. It is in the North Dallas area of Dallas County.

What is the square footage of the work?

The scope of work covers 16,877 sq ft. The estimated cost per square foot is $73.

What is CSW Industrials Expansion?

CSW Industrials Expansion is a renovation/alteration project at 5420 LBJ Freeway Suite 500 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement

Is CSW Industrials Expansion open in Dallas?

CSW Industrials Expansion was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is CSW Industrials Expansion located?

CSW Industrials Expansion is located at 5420 LBJ Freeway Suite 500, Dallas, TX, 75240, in Dallas County.

Who is the owner or developer of CSW Industrials Expansion?

TIAA is the property owner/developer of record for CSW Industrials Expansion, per its TDLR project registration.

Who is the architect or design firm for CSW Industrials Expansion?

Entos Design is the design firm of record for CSW Industrials Expansion, according to its TDLR filing.

How much does CSW Industrials Expansion cost and how big is it?

CSW Industrials Expansion has an estimated construction value of $1.2M and approximately 16,877 square feet (about $73/sqft), based on its TDLR filing.

Scope of Work

Tenant Improvement

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5420 LBJ Freeway Suite 500, Dallas, TX, 75240

Location by street address

Watch all construction in 75240 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.