ABG DFW - Garage Reallocation - Phase 1 is a renovation/alteration project at 2424 E 38th St, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $675K across about 354,000 sq ft.
Design review complete, construction may proceed
ABG DFW - Garage Reallocation - Phase 1 is a Renovation/Alteration project located at 2424 E 38th St, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $675K covering 354,000 sq ft. DFW Airport is the property owner and PGAL is the design firm of record. The project was registered with TDLR on April 16, 2026.
ABG DFW - Garage Reallocation - Phase 1 is a renovation/alteration project at 2424 E 38th St in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfigure rental car areas with signage, striping, and equipment updates for tenant space reallocation.
ABG DFW - Garage Reallocation - Phase 1 is currently under construction in Dfw Airport, TX. Its current TDLR status is "Review Complete".
ABG DFW - Garage Reallocation - Phase 1 is located at 2424 E 38th St, Dfw Airport, TX, 75261, in Tarrant County.
DFW Airport is the property owner/developer of record for ABG DFW - Garage Reallocation - Phase 1, per its TDLR project registration.
PGAL is the design firm of record for ABG DFW - Garage Reallocation - Phase 1, according to its TDLR filing.
ABG DFW - Garage Reallocation - Phase 1 has an estimated construction value of $675K and approximately 354,000 square feet (about $2/sqft), based on its TDLR filing.
Reconfigure rental car areas with signage, striping, and equipment updates for tenant space reallocation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 16, 2026
Review Complete
May 7, 2026
Inspection Complete
Closed
21d
Review duration