Project intelligenceTDLR TABS2026019159Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

3939 SOUTHWEST FWY

3939 SOUTHWEST FWY #700, Houston, TX, 75013

Target date passed (Sep 2026)Review Complete

3939 SOUTHWEST FWY is a renovation/alteration project at 3939 SOUTHWEST FWY #700, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $250K across about 700 sq ft.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$357/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 2026140 days across supplied datesSep 18, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75013 (Houston)

One email per change. Unsubscribe in one click. Privacy.

3939 SOUTHWEST FWY is a Renovation/Alteration project located at 3939 SOUTHWEST FWY #700, Houston, TX 75013 in Houston, Texas. The project has an estimated value of $250K covering 700 sq ft. Texas Petroleum Group, LLC is the property owner and Magaram Engineering is the design firm of record. The project was registered with TDLR on May 1, 2026.

Frequently Asked Questions

What is 3939 SOUTHWEST FWY?

3939 SOUTHWEST FWY is a renovation/alteration project at 3939 SOUTHWEST FWY #700 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of (1) Switchgear and (2) EV Charging Stations

Is 3939 SOUTHWEST FWY open in Houston?

3939 SOUTHWEST FWY was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is 3939 SOUTHWEST FWY located?

3939 SOUTHWEST FWY is located at 3939 SOUTHWEST FWY #700, Houston, TX, 75013, in Harris County.

Who is the owner or developer of 3939 SOUTHWEST FWY?

Texas Petroleum Group, LLC is the property owner/developer of record for 3939 SOUTHWEST FWY, per its TDLR project registration.

Who is the architect or design firm for 3939 SOUTHWEST FWY?

Magaram Engineering is the design firm of record for 3939 SOUTHWEST FWY, according to its TDLR filing.

How much does 3939 SOUTHWEST FWY cost and how big is it?

3939 SOUTHWEST FWY has an estimated construction value of $250K and approximately 700 square feet (about $357/sqft), based on its TDLR filing.

Scope of Work

Installation of (1) Switchgear and (2) EV Charging Stations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3939 SOUTHWEST FWY #700, Houston, TX, 75013

Location by street address

Related City Permits

Building permits found at or near this location

3939 SOUTHWEST FWY EV, Houston, TX 77027

EV CHARGING STATION 2021 IBC

IssuedBuilding PmtAug 2026
HOU-26041798-BUILDINGPMT

Watch all construction in 75013 (Houston)