This project is privately funded, on private land for private use.
800 Louis Henna Blvd EV Charging in Round Rock, TX
800 Louis Henna Blvd, Round Rock, TX, 78664
800 Louis Henna Blvd EV Charging is a renovation/alteration project at 800 Louis Henna Blvd, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $250K across about 700 sq ft.
- Estimated project value
- $250K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $357/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
96 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
53 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 800 Louis Henna Blvd EV Charging
Texas Petroleum Group, LLC is renovating its gas station at 800 Louis Henna Blvd in Round Rock to install electric vehicle charging stations. The project encompasses a 700 sq ft area with an estimated cost of $250,000. This renovation is privately funded on private land for private use, and the work is targeted for January 2027.
The filing identifies Magaram Engineering as the design firm of record. Brian Gary Stanton is listed as the registered accessibility specialist. The project was registered with TDLR in September 2026, and plan review is pending. The scheduled construction window runs from December 2026 to January 2027, a period of 53 days.
Project Scale and Cost
The estimated cost of $250,000 is close to the county median for similar renovation and alteration filings in Williamson County. The median size for these projects is 3,000 sq ft, while this specific project is 700 sq ft. Consequently, the cost per square foot is $357, which is above the county median of $95 per square foot.
Texas Petroleum Group, LLC has six other TDLR-registered projects totaling $1,450,000. These include gas stations in Houston, Kerrville, The Woodlands, Sugar Land, and Katy. Magaram Engineering has four other TDLR-registered projects totaling $1,218,000, with locations in Houston and San Antonio.
Round Rock is situated in Williamson County. The U.S. Census American Community Survey 2023 five-year estimates for ZIP code 78664 indicate a population of about 62,272. The median household income is $85,919, and the median owner-occupied home value is $317,400. There are 24,259 housing units in the area, with an even mix of owner- and renter-occupied homes.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78664 (Round Rock)
One email per change. Unsubscribe in one click. Privacy.
800 Louis Henna Blvd EV Charging is a Renovation/Alteration project located at 800 Louis Henna Blvd, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $250K covering 700 sq ft. Texas Petroleum Group, LLC is the property owner and Magaram Engineering is the design firm of record. The project was registered with TDLR on September 2, 2026.
Frequently Asked Questions
When is the EV charging station project expected to be finished?
The completion date on the filing is January 2027. The project was registered in September 2026, with construction starting in December 2026 and targeted for January 2027.
Who is the owner of the gas station at 800 Louis Henna Blvd?
The owner of record is Texas Petroleum Group, LLC. The design firm of record is Magaram Engineering, and Brian Gary Stanton is the registered accessibility specialist.
How much does the renovation cost?
The estimated cost is $250,000. This figure is close to the median estimated cost for renovation and alteration filings in Williamson County, which is also $250,000.
Is the gas station open for business?
The TDLR record indicates the project is in a registered status with plan review pending. It does not confirm operational status, only that construction is targeted for January 2027.
What is the scope of the work?
The scope of work is the installation of EV Charging Stations. The project type is classified as a Renovation/Alteration.
What is 800 Louis Henna Blvd EV Charging?
800 Louis Henna Blvd EV Charging is a renovation/alteration project at 800 Louis Henna Blvd in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of EV Charging Stations
Is 800 Louis Henna Blvd EV Charging open in Round Rock?
800 Louis Henna Blvd EV Charging is still under construction in Round Rock, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is 800 Louis Henna Blvd EV Charging located?
800 Louis Henna Blvd EV Charging is located at 800 Louis Henna Blvd, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of 800 Louis Henna Blvd EV Charging?
Texas Petroleum Group, LLC is the property owner/developer of record for 800 Louis Henna Blvd EV Charging, per its TDLR project registration.
Who is the architect or design firm for 800 Louis Henna Blvd EV Charging?
Magaram Engineering is the design firm of record for 800 Louis Henna Blvd EV Charging, according to its TDLR filing.
How much does 800 Louis Henna Blvd EV Charging cost and how big is it?
800 Louis Henna Blvd EV Charging has an estimated construction value of $250K and approximately 700 square feet (about $357/sqft), based on its TDLR filing.
Scope of Work
Installation of EV Charging Stations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
800 Louis Henna Blvd, Round Rock, TX, 78664
Related Projects
Same Owner
$950K totalNearby Projects
Within 0.6 miRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Express - Shower to shower replacement
Express - Shower to shower replacement
Replacement of an existing water heater
PALMS - AUS-131 (Congress & 8th) IKE Smart City Kiosk
Watch all construction in 78664 (Round Rock)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Round Rock?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.