Funding type
This project is privately funded, on private land for private use.
9805 S Main EV
9805 S Main St., Houston, TX, 77025
9805 S Main EV is a renovation/alteration project at 9805 S Main St., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $250K across about 700 sq ft.
- Estimated project value
- $250K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $357/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
132 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
80 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 9805 S Main EV
Texas Petroleum Group, LLC is installing EV charging stations at 9805 S Main St. in Houston, a 700-square-foot renovation valued at $250,000. The project, filed under the name 9805 S Main EV, is registered with TDLR and targeted for March 2027. This work represents a specific alteration to an existing gas station rather than new construction, focusing on electrical infrastructure and charging equipment.
Project Scope and Cost
The filing specifies the installation of EV charging stations as the primary scope of work. With an estimated cost of $250,000 for 700 square feet, the project averages $357 per square foot. This figure is above the Harris County median of $80 per square foot for similar renovation and alteration filings, reflecting the specialized nature of EV infrastructure compared to standard building modifications. The total budget aligns closely with the county median of $250,000 for this project type.
Magaram Engineering serves as the design firm of record for this project. The company has four other TDLR-registered projects in Texas, including gas stations in Houston and San Antonio, indicating a pattern of similar work in the energy sector. Texas Petroleum Group, LLC, the owner, holds six other registered projects totaling $1,450,000, including locations in Round Rock, Kerrville, The Woodlands, Sugar Land, and Katy. This Houston project is the most recent in that portfolio to be registered.
Timeline and Status
The project was registered with TDLR in August 2026. Construction is scheduled to begin in January 2027, with a completion date targeted for March 2027. This creates an 80-day build window, which is close to the Harris County median of 92 days for similar projects. Plan review is pending, and the project status is listed as Project Registered.
The site is located in ZIP code 77025, a neighborhood with a population of about 29,177 and a median household income of $78,076 according to U.S. Census estimates. The area has 15,752 housing units, with housing mostly renter-occupied. The median owner-occupied home value in this ZIP code is $521,300. This context helps situate the project within the local economic and residential landscape of the Houston area.
Brian Gary Stanton is the registered accessibility specialist for this work. The project is privately funded on private land for private use. No public funding or government grants are indicated in the filing. The focus remains on private infrastructure development to support electric vehicle adoption in the Houston market.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77025 (Houston)
One email per change. Unsubscribe in one click. Privacy.
9805 S Main EV is a Renovation/Alteration project located at 9805 S Main St., Houston, TX 77025 in Houston, Texas. The project has an estimated value of $250K covering 700 sq ft. Texas Petroleum Group, LLC is the property owner and Magaram Engineering is the design firm of record. The project was registered with TDLR on August 31, 2026.
Frequently Asked Questions
What is being built at 9805 S Main St.?
EV charging stations are being installed at this gas station location. The project is a renovation and alteration valued at $250,000 for 700 square feet of work.
When will the project be finished?
Construction is scheduled to start in January 2027, with completion targeted for March 2027. The project was registered with TDLR in August 2026.
Who owns the gas station?
Texas Petroleum Group, LLC is the owner of record. They have five other TDLR-registered gas station projects in Texas, including locations in Round Rock and The Woodlands.
Is the business open?
The TDLR record only covers the construction of EV charging stations. It does not indicate whether the existing gas station is open or operating. The project is targeted for March 2027.
How much does the project cost per square foot?
The project costs $357 per square foot. This is above the Harris County median of $80 per square foot for renovation and alteration filings.
What is 9805 S Main EV?
9805 S Main EV is a renovation/alteration project at 9805 S Main St. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of EV Charging Stations
Is 9805 S Main EV open in Houston?
9805 S Main EV is still under construction in Houston, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is 9805 S Main EV located?
9805 S Main EV is located at 9805 S Main St., Houston, TX, 77025, in Harris County.
Who is the owner or developer of 9805 S Main EV?
Texas Petroleum Group, LLC is the property owner/developer of record for 9805 S Main EV, per its TDLR project registration.
Who is the architect or design firm for 9805 S Main EV?
Magaram Engineering is the design firm of record for 9805 S Main EV, according to its TDLR filing.
How much does 9805 S Main EV cost and how big is it?
9805 S Main EV has an estimated construction value of $250K and approximately 700 square feet (about $357/sqft), based on its TDLR filing.
Scope of Work
Installation of EV Charging Stations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
9805 S Main St., Houston, TX, 77025
Related Projects
Same Owner
$950K totalNearby Projects
Within 1 kmWatch all construction in 77025 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.