Dollar Tree
Dollar Tree is a renovation/alteration project at 4001 W. William Cannon Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $656K across about 12,989 sq ft.
๐Project Metrics
TDLR #TABS2026020938Project Registered
Project has been registered with TDLR and is in pre-construction phase
Dollar Tree is a Renovation/Alteration project located at 4001 W. William Cannon Drive, Austin, TX 78749 in Austin, Texas. The project has an estimated value of $656K covering 12,989 sq ft. TME-OK LLC is the property owner and CASCO is the design firm of record. The project was registered with TDLR on May 21, 2026.
โFrequently Asked Questions
What is Dollar Tree?
Dollar Tree is a renovation/alteration project at 4001 W. William Cannon Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing tenant retail space.
Is Dollar Tree open in Austin?
Dollar Tree is still under construction in Austin, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Dollar Tree located?
Dollar Tree is located at 4001 W. William Cannon Drive, Austin, TX, 78749, in Travis County.
Who is the owner or developer of Dollar Tree?
TME-OK LLC is the property owner/developer of record for Dollar Tree, per its TDLR project registration.
Who is the architect or design firm for Dollar Tree?
CASCO is the design firm of record for Dollar Tree, according to its TDLR filing.
How much does Dollar Tree cost and how big is it?
Dollar Tree has an estimated construction value of $656K and approximately 12,989 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing tenant retail space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 21, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$3.0M total๐Related City Permits
Building permits found at or near this location
Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system
Interior Alteration to approximately 4069 sq ft of existing office space.
New 1-story detached accessory structure (pool side cabana) 1 bath with stone veneer flat TPO roof wood frame on drilled concrete caissons. Cabana includes bathroom (shower + WC). Reconnect to existing underground electrical conduit previously servicing pergola. Install new 60 amp subpanel in cabana. One dedicated circuit for 1-ton ductless mini-split (230v)
Interior Alteration to approximately 4069 sq ft of existing office space including the Level 1 and Level 2 lobby areas [Level 1 & 2 Lobby]