SAT Terminal C Parking Garage in San Antonio, TX

9619 W Terminal Drive, San Antonio, TX, 78216

Opening ~Dec 2027Review Complete

SAT Terminal C Parking Garage is a new construction project at 9619 W Terminal Drive, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $110.0M across about 1,170,315 sq ft.

Estimated project value
$110.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,170,315 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$94/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 8, 2026555 days across supplied datesDec 15, 2027

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    1 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    496 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SAT Terminal C Parking Garage

The SAT Terminal C Parking Garage is a new seven-level precast concrete structure located at 9619 W Terminal Drive in San Antonio. This 1,170,315 sq ft facility features a ground transportation center and a dedicated lobby on the ground level. The City of San Antonio is the owner of record for this $110,000,000 project, which is classified as new construction in Bexar County.

Marmon Mok Architecture serves as the design firm of record. Peter F Grojean is the registered accessibility specialist for the project. TDLR completed plan review in August 2026, and construction is scheduled to finish in December 2027, with work starting June 2026. The project involves public funds and public land.

The estimated cost of $110,000,000 is above the Bexar County median for new construction filings. The calculated cost of $94 per square foot is below the county median of $115. The scheduled build window of 555 days is longer than the county median of 208 days.

The City of San Antonio has five other TDLR-registered projects in the area, including Pearsall Park and Clearview Dr. Marmon Mok Architecture has five other registered projects totaling $28,160,000, such as the University Health Community Hospital - Retama. The project is part of the San Antonio International Airport expansion, as noted in a Facebook post by DFWRHCA.

Local context for ZIP 78216 shows a population of about 42,044 and a median household income of $55,488. The Bexar County unemployment rate was 4.7 percent in July 2026. A Facebook post by SATairport stated that JE Dunn Construction has officially begun work on the facility. The project is registered with TDLR and is in the review complete status.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78216 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

SAT Terminal C Parking Garage is a New Construction project located at 9619 W Terminal Drive, San Antonio, TX 78216 in San Antonio, Texas. The project has an estimated value of $110.0M covering 1,170,315 sq ft. City of San Antonio is the property owner and Marmon Mok Architecture is the design firm of record. The project was registered with TDLR on June 9, 2026.

Frequently Asked Questions

Is the SAT Terminal C Parking Garage open?

The project is under construction. TDLR records show plan review completed in August 2026, with construction scheduled to finish in December 2027. It is not yet open to the public.

Who is building the SAT Terminal C Parking Garage?

The City of San Antonio is the owner. Marmon Mok Architecture is the design firm. A Facebook post by SATairport stated that JE Dunn Construction has officially begun work.

How much does the SAT Terminal C Parking Garage cost?

The estimated cost is $110,000,000. This figure is above the Bexar County median for new construction, while the $94 per square foot cost is below the county median.

When will the SAT Terminal C Parking Garage be finished?

Construction is scheduled to finish in December 2027. Work started in June 2026, and TDLR completed plan review in August 2026.

What is SAT Terminal C Parking Garage?

SAT Terminal C Parking Garage is a new construction project at 9619 W Terminal Drive in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 7 Level precast concrete parking garage with a ground transportation center (GTC) on the ground level and GTC lobby.

Is SAT Terminal C Parking Garage open in San Antonio?

SAT Terminal C Parking Garage is still under construction in San Antonio, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is SAT Terminal C Parking Garage located?

SAT Terminal C Parking Garage is located at 9619 W Terminal Drive, San Antonio, TX, 78216, in Bexar County.

Who is the owner or developer of SAT Terminal C Parking Garage?

City of San Antonio is the property owner/developer of record for SAT Terminal C Parking Garage, per its TDLR project registration.

Who is the architect or design firm for SAT Terminal C Parking Garage?

Marmon Mok Architecture is the design firm of record for SAT Terminal C Parking Garage, according to its TDLR filing.

How much does SAT Terminal C Parking Garage cost and how big is it?

SAT Terminal C Parking Garage has an estimated construction value of $110.0M and approximately 1,170,315 square feet (about $94/sqft), based on its TDLR filing.

Scope of Work

7 Level precast concrete parking garage with a ground transportation center (GTC) on the ground level and GTC lobby.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9619 W Terminal Drive, San Antonio, TX, 78216

Location by street address

Related City Permits

Building permits found at or near this location

9619 W TERMINAL DR, City of San Antonio, TX 78216

Building No: 9619

IssuedPlumbing General PermitNewJun 2026
SAT-COM-FND-PMT26-40300006

Watch all construction in 78216 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.