Joint K9 and Bomb Squad Complex Renovation in Dfw Airport, TX
1540 W. 27th Street, Dfw Airport, TX, 75251
Joint K9 and Bomb Squad Complex Renovation is a renovation/alteration project at 1540 W. 27th Street, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $4.9M across about 25,000 sq ft.
- Estimated project value
- $4.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $196/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
130 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
424 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Joint K9 and Bomb Squad Complex Renovation
The City of Dallas/DFW Airport Division is overseeing a major renovation at 1540 W. 27th Street in Dfw Airport, Tarrant County. The project, filed as the Joint K9 and Bomb Squad Complex Renovation, transforms ARFF Station 4 from a fire station into an office building. It also expands the existing K9/EOD Facility by adding ten new dog kennels. The estimated cost for this renovation and alteration work is $4,900,000. The project covers 25,000 square feet of space, resulting in a cost of $196 per square foot. The registered accessibility specialist for this filing is Marcela Abadi Rhoads, and the design firm of record is EXP U.S. Services.
Project Status and Timeline
The project was registered with TDLR in June 2026. Plan review is pending, and construction is scheduled to begin in November 2026. The filing indicates that completion is targeted for December 2027. This timeline represents a scheduled build window of 424 days. This duration is longer than the county median of 92 days for similar renovation and alteration filings. The estimated cost is above the county median of $250,000. The cost per square foot is also above the county median of $79. The project involves public funds and public land.
The City of Dallas/DFW Airport Division has six other TDLR-registered projects totaling $3,055,000. These include work on Terminal C and Terminal D in Dfw Airport, as well as a make-ready project in Dallas. The area profile for ZIP 75251 shows a population of about 3,529. The median household income is estimated at $84,791. There are 2,847 housing units in the area. Tarrant County unemployment was 4.6 percent in July 2026.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75251 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
Joint K9 and Bomb Squad Complex Renovation is a Renovation/Alteration project located at 1540 W. 27th Street, Dfw Airport, TX 75251 in Dfw Airport, Texas. The project has an estimated value of $4.9M covering 25,000 sq ft. City of Dallas/DFW Airport Division is the property owner and EXP U.S. Services is the design firm of record. The project was registered with TDLR on June 24, 2026.
Frequently Asked Questions
When is the K9 and Bomb Squad Complex renovation scheduled to finish?
The filing states that completion is targeted for December 2027. Construction is scheduled to begin in November 2026, following the registration with TDLR in June 2026.
What is the estimated cost of the project?
The estimated cost for the renovation and alteration work is $4,900,000. This figure covers the conversion of the fire station and the expansion of the K9/EOD facility.
Who is the owner of the project?
The owner of record is the City of Dallas/DFW Airport Division. The design firm of record is EXP U.S. Services.
Is the project located in a flood zone?
It is designated as zone X according to the FEMA National Flood Hazard Layer.
What is the scope of the renovation work?
The scope includes renovating ARFF Station 4 from a fire station to an office building and expanding the existing K9/EOD Facility with ten new dog kennels.
What is Joint K9 and Bomb Squad Complex Renovation?
Joint K9 and Bomb Squad Complex Renovation is a renovation/alteration project at 1540 W. 27th Street in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of ARFF Station 4 from a fire station to an office building and the expansion of the existing K9/EOD Facility with 10 new dog kennels
Is Joint K9 and Bomb Squad Complex Renovation open in Dfw Airport?
Joint K9 and Bomb Squad Complex Renovation is still under construction in Dfw Airport, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Joint K9 and Bomb Squad Complex Renovation located?
Joint K9 and Bomb Squad Complex Renovation is located at 1540 W. 27th Street, Dfw Airport, TX, 75251, in Tarrant County.
Who is the owner or developer of Joint K9 and Bomb Squad Complex Renovation?
City of Dallas/DFW Airport Division is the property owner/developer of record for Joint K9 and Bomb Squad Complex Renovation, per its TDLR project registration.
Who is the architect or design firm for Joint K9 and Bomb Squad Complex Renovation?
EXP U.S. Services is the design firm of record for Joint K9 and Bomb Squad Complex Renovation, according to its TDLR filing.
How much does Joint K9 and Bomb Squad Complex Renovation cost and how big is it?
Joint K9 and Bomb Squad Complex Renovation has an estimated construction value of $4.9M and approximately 25,000 square feet (about $196/sqft), based on its TDLR filing.
Scope of Work
Renovation of ARFF Station 4 from a fire station to an office building and the expansion of the existing K9/EOD Facility with 10 new dog kennels
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1540 W. 27th Street, Dfw Airport, TX, 75251
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 75251 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.