Take 5 Oil Change
5005 Gulfway Dr, Port Arthur, TX, 77642
Take 5 Oil Change is a new construction project at 5005 Gulfway Dr, Port Arthur, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $650K across about 1,452 sq ft.
- Estimated project value
- $650K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,452 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $448/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
93 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
151 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Take 5 Oil Change
Take 5 Oil Change Port Arthur is a new construction project for a 1,452 sq ft oil change facility located at 5005 Gulfway Dr in Port Arthur. The project is registered with TDLR, with construction scheduled to begin in October 2026 and completion targeted for March 2027. The estimated cost is $650,000, which equates to $448 per square foot.
The owner of record is Take 5 Properties SPV, LLC, which holds six other TDLR-registered projects totaling $2,900,000 across Texas. These include locations in Harker Heights, Montgomery, Rowlett, Tyler, and Denton. The design firm of record is Altar Group, which also has six other registered projects totaling $3,285,000, including sites in Houston, Cleveland, Ennis, Willis, and Harker Heights.
Project Scope and Cost Context
The scope of work is defined as a new oil change facility. This project is privately funded on private land for private use. In Jefferson County, the median estimated cost for similar new construction filings is $750,000. This project’s cost is close to that county median. However, the $448 per square foot cost is above the county median of $145 per square foot. The scheduled build window of 151 days is shorter than the county median of 242 days.
The registered accessibility specialist for this project is Kari Thomas. The project was registered with TDLR in June 2026. Plan review is pending. The filing indicates a start date of October 2026. The completion date on the filing is March 2027.
Port Arthur is in Jefferson County. The ZIP code 77642 has a population of about 38,051 according to U.S. Census ACS 2023 five-year estimates. The median household income in that ZIP code is $41,677. There are 16,234 housing units in the area. The median owner-occupied home value is $96,100. Housing is an even mix of owner- and renter-occupied.
The Jefferson County unemployment rate was 5 percent in July 2026, according to FRED. This project adds to the local construction activity in the area. The specific address is 5005 Gulfway Dr. The city is Port Arthur. The state is Texas. The ZIP code is 77642.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77642 (Port Arthur)
One email per change. Unsubscribe in one click. Privacy.
Take 5 Oil Change is a New Construction project located at 5005 Gulfway Dr, Port Arthur, TX 77642 in Port Arthur, Texas. The project has an estimated value of $650K covering 1,452 sq ft. Take 5 Properties SPV, LLC is the property owner and Altar Group is the design firm of record. The project was registered with TDLR on June 30, 2026.
Frequently Asked Questions
Is the Take 5 Oil Change in Port Arthur open?
No, the project is not open. It is a new construction project with a start date of October 2026 and completion targeted for March 2027.
Where is the new Take 5 Oil Change facility located?
The facility is located at 5005 Gulfway Dr, Port Arthur, TX 77642, in Jefferson County.
Who is the owner of the Port Arthur Take 5 Oil Change project?
The owner of record is Take 5 Properties SPV, LLC, which is also the developer of the facility.
What is the estimated cost of the new facility?
The estimated cost for the new oil change facility is $650,000, which works out to $448 per square foot.
When is the construction scheduled to be completed?
Completion is targeted for March 2027, with construction scheduled to begin in October 2026.
What is Take 5 Oil Change?
Take 5 Oil Change is a new construction project at 5005 Gulfway Dr in Port Arthur, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New oil change facility
Is Take 5 Oil Change open in Port Arthur?
Take 5 Oil Change is still under construction in Port Arthur, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Take 5 Oil Change located?
Take 5 Oil Change is located at 5005 Gulfway Dr, Port Arthur, TX, 77642, in Jefferson County.
Who is the owner or developer of Take 5 Oil Change?
Take 5 Properties SPV, LLC is the property owner/developer of record for Take 5 Oil Change, per its TDLR project registration.
Who is the architect or design firm for Take 5 Oil Change?
Altar Group is the design firm of record for Take 5 Oil Change, according to its TDLR filing.
How much does Take 5 Oil Change cost and how big is it?
Take 5 Oil Change has an estimated construction value of $650K and approximately 1,452 square feet (about $448/sqft), based on its TDLR filing.
Scope of Work
New oil change facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5005 Gulfway Dr, Port Arthur, TX, 77642
Related Projects
Same Owner
$2.0M totalNearby Projects
Within 1 kmWatch all construction in 77642 (Port Arthur)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Port Arthur?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.