Project intelligenceTDLR TABS2026027698Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

McMillan James Equipment Company Austin Office TI

1908 Kramer Lane Suite B200, Austin, TX, 78758

Opening ~Dec 2026Review Complete

McMillan James Equipment Company Austin Office TI is a renovation/alteration project at 1908 Kramer Lane Suite B200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $756K across about 12,728 sq ft.

Estimated project value
$756K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,728 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$59/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 13, 2026140 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    119 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About McMillan James Equipment Company Austin Office TI

McMillan James Equipment Company is renovating its Austin office at 1908 Kramer Lane, Suite B200. The project involves the interior alteration of an existing 12,728-square-foot tenant space within the building located at 1908 Kramer Lane in Travis County. This work is strictly limited to the interior and does not change the building's use, the tenant's function, or the required parking configuration. No site work is included in the scope of this filing.

The renovation is estimated to cost $756,000, which works out to $59 per square foot. This cost per square foot is below the county median of $103 for similar renovation and alteration projects in Travis County. While the total estimated cost is above the county median for this work type, the scheduled build window of 122 days is close to the county median of 98 days. The project is privately funded on private land for private use.

Project Status and Timeline

Construction on this project started in August 2026. TDLR completed the plan review process in September 2026, marking the status as Review Complete. The work is scheduled to finish in December 2026. This timeline aligns with the initial registration date of August 2026, indicating a steady progression through the approval and construction phases without significant delays in the recorded schedule.

The design firm of record is Merriman Anderson Architects, with Bonita L Anderson serving as the registered accessibility specialist. Merriman Anderson Architects has been involved in six other TDLR-registered projects, including large-scale developments in Plano, Waco, Pflugerville, Dallas, and Grapevine. The owner of record is Braker Metric Business Part, LLC, a Delaware limited liability company.

City of Austin permit records show three permits on file at this street address, issued between April 2024 and August 2026. These include two building permits and one electrical permit, with declared valuations totaling $756,000. The most recent permit activity involved interior non-structural demolition and the addition of four power poles with existing circuiting. These records support the scope of interior alterations described in the TDLR filing for this specific suite.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78758 (Austin)

One email per change. Unsubscribe in one click. Privacy.

McMillan James Equipment Company Austin Office TI is a Renovation/Alteration project located at 1908 Kramer Lane Suite B200, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $756K covering 12,728 sq ft. Braker Metric Business Part, LLC, a Delaware limited liability company is the property owner and Merriman Anderson Architects is the design firm of record. The project was registered with TDLR on August 13, 2026.

Frequently Asked Questions

When will the renovation be complete?

The project is scheduled to finish in December 2026. Construction began in August 2026, and TDLR completed plan review in September 2026.

What is the total cost of the project?

The estimated cost is $756,000. This figure corresponds to the declared valuations on the city permits filed at this address.

Who is designing the office renovation?

Merriman Anderson Architects is the design firm of record. Bonita L Anderson is the registered accessibility specialist for the project.

Does the renovation include exterior or site work?

No. The scope is limited to interior alteration of the existing tenant space. The filing explicitly states that no site work to the existing building is included.

Is the business open for business?

The TDLR record tracks construction status, not business operations. The project is scheduled to finish in December 2026, but no opening date is provided in the filing.

What is McMillan James Equipment Company Austin Office TI?

McMillan James Equipment Company Austin Office TI is a renovation/alteration project at 1908 Kramer Lane Suite B200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration of an existing tenant space that does not change building or tenant use, existing 12,728 square feet, or required parking. Scope of project does not include any site work to the existing building.

Is McMillan James Equipment Company Austin Office TI open in Austin?

McMillan James Equipment Company Austin Office TI is still under construction in Austin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is McMillan James Equipment Company Austin Office TI located?

McMillan James Equipment Company Austin Office TI is located at 1908 Kramer Lane Suite B200, Austin, TX, 78758, in Travis County.

Who is the owner or developer of McMillan James Equipment Company Austin Office TI?

Braker Metric Business Part, LLC, a Delaware limited liability company is the property owner/developer of record for McMillan James Equipment Company Austin Office TI, per its TDLR project registration.

Who is the architect or design firm for McMillan James Equipment Company Austin Office TI?

Merriman Anderson Architects is the design firm of record for McMillan James Equipment Company Austin Office TI, according to its TDLR filing.

How much does McMillan James Equipment Company Austin Office TI cost and how big is it?

McMillan James Equipment Company Austin Office TI has an estimated construction value of $756K and approximately 12,728 square feet (about $59/sqft), based on its TDLR filing.

Scope of Work

Interior alteration of an existing tenant space that does not change building or tenant use, existing 12,728 square feet, or required parking. Scope of project does not include any site work to the existing building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1908 Kramer Lane Suite B200, Austin, TX, 78758

30.38782, -97.70836

Related City Permits

Building permits found at or near this location

1910 Kramer Lane A .00000
Same location

Berm Sign For B2

FinalElectrical PermitApr 1985
View Details
1985-016583 EP
1910 Kramer Lane A 00000
Same location

Berm Sign For B3

FinalElectrical PermitApr 1985
View Details
1985-016586 EP

Watch all construction in 78758 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.