Project intelligenceTDLR TABS2027001194New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Princeton ISD Anthony High School

ABS A0892 W D Thompson Survey, Sheet 2 Tract 121, Princeton, TX, 75407

Opening ~Jul 2029Project Registered

Princeton ISD Anthony High School is a new construction project at ABS A0892 W D Thompson Survey, Sheet 2 Tract 121, Princeton, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2029. The project has an estimated value of $186.0M across about 445,000 sq ft.

Estimated project value
$186.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
445,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$418/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 20261,019 days across supplied datesJul 1, 2029

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    166 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    853 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Princeton ISD Anthony High School

Princeton ISD is building a new 445,000 sq ft, three-story high school in Collin County. The project, listed in TDLR records as Princeton ISD Anthony High School, is registered with a registered accessibility specialist and involves the construction of associated parking and an athletics field.

The estimated cost for this new construction is $186,000,000, which works out to $418 per square foot. This figure is above the county median of $120 per square foot for similar new construction filings in Collin County. The total budget places the project in the top quarter of estimated costs for its type within the county.

Design and Location

Claycomb Associates, Architects is the design firm of record for the project. The firm has six other TDLR-registered projects totaling $174,728,477, including schools in Diboll, Fairfield, and Needville. The site is located at ABS A0892 W D Thompson Survey, Sheet 2 Tract 121 in Princeton, TX 75407. According to FEMA data, the site is inside a Special Flood Hazard Area, specifically zone AE.

The project was registered with TDLR in September 2026. Plan review is pending, and the scheduled construction start is March 2027. The completion date on the filing is targeted for July 2029. This scheduled build window of 853 days is longer than the county median of 212 days for new construction projects.

The project involves public funds and public land. The surrounding area, ZIP code 75407, has a population of about 28,931 and a median household income of $92,076, according to U.S. Census estimates. The median owner-occupied home value in the area is $307,500. Collin County unemployment was 4.6 percent in July 2026, higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75407 (Princeton)

One email per change. Unsubscribe in one click. Privacy.

Princeton ISD Anthony High School is a New Construction project located at ABS A0892 W D Thompson Survey, Sheet 2 Tract 121, Princeton, TX 75407 in Princeton, Texas. The project has an estimated value of $186.0M covering 445,000 sq ft. Princeton ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on September 16, 2026.

Frequently Asked Questions

What is the estimated cost of the Anthony High School project?

The estimated cost is $186,000,000. This equates to $418 per square foot for the 445,000 sq ft building.

Who is the design firm for this project?

Claycomb Associates, Architects is the design firm of record. They have six other TDLR-registered projects totaling $174,728,477.

When is the project targeted for completion?

The project is targeted for July 2029. Plan review is pending, and construction is scheduled to start in March 2027.

Is the site in a flood zone?

Yes. The site is inside a FEMA Special Flood Hazard Area, specifically zone AE, according to the National Flood Hazard Layer.

Who is the owner of the project?

Princeton ISD is the owner/developer of record for the new high school construction.

What is Princeton ISD Anthony High School?

Princeton ISD Anthony High School is a new construction project at ABS A0892 W D Thompson Survey, Sheet 2 Tract 121 in Princeton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 445,000 SqFt, three story high school with associated parking and athletics field.

Is Princeton ISD Anthony High School open in Princeton?

Princeton ISD Anthony High School is still under construction in Princeton, TX, with an estimated completion of Jul 2029 according to its TDLR registration.

Where is Princeton ISD Anthony High School located?

Princeton ISD Anthony High School is located at ABS A0892 W D Thompson Survey, Sheet 2 Tract 121, Princeton, TX, 75407, in Collin County.

Who is the owner or developer of Princeton ISD Anthony High School?

Princeton ISD is the property owner/developer of record for Princeton ISD Anthony High School, per its TDLR project registration.

Who is the architect or design firm for Princeton ISD Anthony High School?

Claycomb Associates, Architects is the design firm of record for Princeton ISD Anthony High School, according to its TDLR filing.

How much does Princeton ISD Anthony High School cost and how big is it?

Princeton ISD Anthony High School has an estimated construction value of $186.0M and approximately 445,000 square feet (about $418/sqft), based on its TDLR filing.

Scope of Work

New 445,000 SqFt, three story high school with associated parking and athletics field.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

ABS A0892 W D Thompson Survey, Sheet 2 Tract 121, Princeton, TX, 75407

33.16096, -96.60610

Watch all construction in 75407 (Princeton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Princeton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.