Diboll Junior High Renovation
403 Dennis St., Diboll, TX, 75941
Diboll Junior High Renovation is a renovation/alteration project at 403 Dennis St., Diboll, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $9.9M across about 52,234 sq ft.
- Estimated project value
- $9.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 52,234 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $190/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
2 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
399 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Diboll Junior High Renovation
Diboll Junior High is undergoing a major renovation at 403 Dennis St. in Diboll, Texas. The project, filed as the Diboll Junior High Renovation, involves work on the existing Junior High School buildings. The total estimated cost for this renovation and alteration is $9,940,022, covering 52,234 sq ft of construction space.
The project is registered with TDLR in Angelina County. It was registered in September 2026, and construction start is scheduled for September 2026. The filing indicates that plan review is pending, and the project is targeted for October 2027. This timeline represents a scheduled build window of 401 days, which is longer than the 121-day median for similar renovation projects in the county.
Project Scope and Cost
Claycomb Associates, Architects is the design firm of record for this project. The scope of work is described in the filing as renovation work of the existing Junior High School buildings. The estimated cost per square foot is $190. This figure is above the county median of $84 per square foot for renovation and alteration filings. The total project cost is also above the county median of $250,000, placing it in the top quarter of similar projects by cost in Angelina County.
Diboll Independent School District is the owner and developer of record. The district has six other TDLR-registered projects totaling $2,250,000, including work at the Diboll ISD High School and the Lumberjack Stadium. All six of these prior projects are listed as closed. The current renovation is a significant investment in the district's junior high facilities, utilizing public funds on public land.
Local Context and Registration
The site is located in ZIP code 75941, which has a population of about 8,712 according to U.S. Census estimates. The median household income in this area is $57,892, and the median owner-occupied home value is $93,800. Phillip Bertram Chapman is the registered accessibility specialist for this project. The TDLR status is listed as Project Registered, with the registration occurring in September 2026.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75941 (Diboll)
One email per change. Unsubscribe in one click. Privacy.
Diboll Junior High Renovation is a Renovation/Alteration project located at 403 Dennis St., Diboll, TX 75941 in Diboll, Texas. The project has an estimated value of $9.9M covering 52,234 sq ft. Diboll Independent School District is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on September 16, 2026.
Frequently Asked Questions
What is the estimated cost of the Diboll Junior High renovation?
The estimated cost for the Diboll Junior High Renovation is $9,940,022. This figure covers 52,234 sq ft of work, resulting in an estimated cost of $190 per square foot.
When is the Diboll Junior High renovation expected to be completed?
The project is targeted for October 2027. It was registered with TDLR in September 2026, and construction start is scheduled for the same month.
Who is the design firm for the Diboll Junior High project?
Claycomb Associates, Architects is the design firm of record. They are responsible for the architectural design of the renovation work on the existing buildings.
Is the Diboll Junior High renovation project open to the public?
The project is in the registration and planning phase. Construction start is scheduled for September 2026, and the project is targeted for October 2027 completion.
What is the scope of work for the Diboll Junior High renovation?
The filing describes the scope as renovation work of the existing Junior High School buildings. It is classified as a renovation and alteration project.
What is Diboll Junior High Renovation?
Diboll Junior High Renovation is a renovation/alteration project at 403 Dennis St. in Diboll, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation work of the existing Junior High School buildings.
Is Diboll Junior High Renovation open in Diboll?
Diboll Junior High Renovation is still under construction in Diboll, TX, with an estimated completion of Oct 2027 according to its TDLR registration.
Where is Diboll Junior High Renovation located?
Diboll Junior High Renovation is located at 403 Dennis St., Diboll, TX, 75941, in Angelina County.
Who is the owner or developer of Diboll Junior High Renovation?
Diboll Independent School District is the property owner/developer of record for Diboll Junior High Renovation, per its TDLR project registration.
Who is the architect or design firm for Diboll Junior High Renovation?
Claycomb Associates, Architects is the design firm of record for Diboll Junior High Renovation, according to its TDLR filing.
How much does Diboll Junior High Renovation cost and how big is it?
Diboll Junior High Renovation has an estimated construction value of $9.9M and approximately 52,234 square feet (about $190/sqft), based on its TDLR filing.
Scope of Work
Renovation work of the existing Junior High School buildings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
403 Dennis St., Diboll, TX, 75941
Related Projects
Same Owner
$10.3M totalWatch all construction in 75941 (Diboll)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Diboll?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.