Project intelligenceTDLR TABS2027004302Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Redwater Track and Field Replacement

120 Red River Rd N, Redwater, TX, 75573

Opening ~Apr 2027Review Complete

Redwater Track and Field Replacement is a renovation/alteration project at 120 Red River Rd N, Redwater, in Bowie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $3.0M across about 150,000 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
150,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$20/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 23, 2026160 days across supplied datesApr 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    121 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Redwater Track and Field Replacement

Dragon Stadium in Redwater is undergoing a significant renovation at 120 Red River Rd N, Bowie County. The project, listed on the TDLR registry as Redwater Track and Field Replacement, involves replacing an existing track and football field with new infrastructure. The estimated cost for this work is $3,000,000 across 150,000 sq ft, resulting in a cost per square foot of $20.

Redwater ISD is the owner of record for this improvement. Claycomb Associates, Architects serves as the design firm, while Phillip Bertram Chapman is the registered accessibility specialist overseeing the TABS compliance. The project involves public funds and public land, requiring strict adherence to state accessibility standards for public facilities.

Construction is scheduled to begin in December 2026. TDLR completed the plan review in October 2026, and the project is registered with TDLR . The work is scheduled to finish in April 2027. This timeline indicates a build window of approximately 121 days, which is close to the county median of 122 days for similar renovation projects.

Financially, the $3,000,000 estimated cost places this project in the top quarter of TDLR-registered renovation and alteration filings in Bowie County. The median estimated cost for these projects is $270,000. However, the $20 per sq ft cost is below the county median of $85 per sq ft. This suggests a large-scale project with lower unit costs compared to typical local alterations.

Claycomb Associates, Architects has a history of large-scale educational projects in Texas. Their other TDLR-registered filings include Anthony High School in Princeton for $186,000,000, Fairfield High School in Fairfield for $85,000,000, and Needville High School in Needville for $40,393,219. These projects are all in various stages of review or registration.

This means the property is not subject to the same flood insurance requirements as areas within the Special Flood Hazard Area. The local area, ZIP 75573, has a population of about 246 and a median household income of $67,188 according to Census estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75573 (Redwater)

One email per change. Unsubscribe in one click. Privacy.

Redwater Track and Field Replacement is a Renovation/Alteration project located at 120 Red River Rd N, Redwater, TX 75573 in Redwater, Texas. The project has an estimated value of $3.0M covering 150,000 sq ft. Redwater ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on October 23, 2026.

Frequently Asked Questions

What is the Dragon Stadium project in Redwater?

It is a renovation and alteration project to replace an existing track and football field with new infrastructure. The estimated cost is $3,000,000 for 150,000 sq ft of work.

Who is the owner of the Dragon Stadium project?

Redwater ISD is the owner of record for this project. The design firm is Claycomb Associates, Architects, and the registered accessibility specialist is Phillip Bertram Chapman.

When does construction start and finish?

Construction is scheduled to start in December 2026 and is scheduled to finish in April 2027. The TDLR plan review was completed in October 2026.

Is the Dragon Stadium facility currently open for use?

The TDLR record covers construction only and does not record whether the business has started serving customers. The project is scheduled to finish in April 2027.

What is Redwater Track and Field Replacement?

Redwater Track and Field Replacement is a renovation/alteration project at 120 Red River Rd N in Redwater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of an existing track and football field with new.

Is Redwater Track and Field Replacement open in Redwater?

Redwater Track and Field Replacement is still under construction in Redwater, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Redwater Track and Field Replacement located?

Redwater Track and Field Replacement is located at 120 Red River Rd N, Redwater, TX, 75573, in Bowie County.

Who is the owner or developer of Redwater Track and Field Replacement?

Redwater ISD is the property owner/developer of record for Redwater Track and Field Replacement, per its TDLR project registration.

Who is the architect or design firm for Redwater Track and Field Replacement?

Claycomb Associates, Architects is the design firm of record for Redwater Track and Field Replacement, according to its TDLR filing.

How much does Redwater Track and Field Replacement cost and how big is it?

Redwater Track and Field Replacement has an estimated construction value of $3.0M and approximately 150,000 square feet (about $20/sqft), based on its TDLR filing.

Scope of Work

Replacement of an existing track and football field with new.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

120 Red River Rd N, Redwater, TX, 75573

Loading location map…
33.36964, -94.24853

Watch all construction in 75573 (Redwater)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Redwater?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.