Project intelligenceTDLR TABS2027006716Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install in Austin, TX

12100 Samsung Blvd, Austin, TX, 78754

Opening ~Aug 2027Project Registered

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install is a renovation/alteration project at 12100 Samsung Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $1.3M across about 1,400 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$929/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 24, 2026250 days across supplied datesAug 1, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install

Samsung Austin Semiconductor has registered a renovation project at 12100 Samsung Blvd in Austin, Travis County. The filing, identified as SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install, covers 1,400 square feet of interior work. The estimated cost for this private construction is $1,300,000. This places the project in the top quarter of renovation and alteration filings in Travis County, which typically cost around $300,000. The registered accessibility specialist for the job is Mark S Robinson.

Scope and Technical Details

The work involves significant mechanical and electrical upgrades within the facility. The scope includes installing a ClF3 Gas Cabinet in the F2M1 North Bunker, along with all associated systems. Additionally, a ClF3 VMB will be installed in the F2M1 CSF near column H23. The project also requires the installation of a TiCl4 DTLR in the F2M1 CSF with corresponding mechanical and electrical connections. These specialized installations drive the cost per square foot to $929, which is well above the county median of $104.

Timeline and Financials

Fuse Architecture Studio is the design firm of record for this project. Samsung Austin Semiconductor is the owner, and the work is privately funded on private land. The project was registered with TDLR in November 2026, with construction scheduled to begin that same month. The completion date on the filing is targeted for August 2027. This build window of 244 days is longer than the county median of 99 days for similar projects.

At this address, City of Austin permit records show at least 25 permits on file. The most recent permits, issued between September 2024 and September 2026, include electrical, building, plumbing, and mechanical types. These permits have declared valuations totaling $9,981,475. The site is located outside the FEMA Special Flood Hazard Area (zone X). Samsung has other registered projects in Austin, but this specific filing remains in the plan review phase.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78754 (Austin)

One email per change. Unsubscribe in one click. Privacy.

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install is a Renovation/Alteration project located at 12100 Samsung Blvd, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $1.3M covering 1,400 sq ft. Samsung is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on November 24, 2026.

Frequently Asked Questions

Who is the accessibility specialist for this Samsung Austin project?

Mark S Robinson is the registered accessibility specialist for the SAS GCS Capa-Up project at 12100 Samsung Blvd.

What is the total estimated cost of the renovation?

The estimated cost for the 1,400 square foot renovation is $1,300,000, covering mechanical and electrical installations.

When does construction start and end?

Construction is scheduled to start in November 2026 and is targeted for August 2027.

Is the business open for customers?

The TDLR record covers construction only and does not record whether the business has started serving customers.

What is SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install?

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install is a renovation/alteration project at 12100 Samsung Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install ClF3 Gas Cabinet in F2M1 North Bunker and all associated mechanical & electrical. Install ClF3 VMB in F2M1 CSF, near col. H23 and all associated mechanical & electrical. Install TiCl4 DTLR in F2M1 CSF and all associated mechanica…

Is SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install open in Austin?

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install is still under construction in Austin, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install located?

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install is located at 12100 Samsung Blvd, Austin, TX, 78754, in Travis County.

Who is the owner or developer of SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install?

Samsung is the property owner/developer of record for SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install, per its TDLR project registration.

Who is the architect or design firm for SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install?

Fuse Architecture Studio is the design firm of record for SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install, according to its TDLR filing.

How much does SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install cost and how big is it?

SAS GCS Capa-Up - Case 79 Install - (F226-SG10) STGS08 Install has an estimated construction value of $1.3M and approximately 1,400 square feet (about $929/sqft), based on its TDLR filing.

Scope of Work

Install ClF3 Gas Cabinet in F2M1 North Bunker and all associated mechanical & electrical. Install ClF3 VMB in F2M1 CSF, near col. H23 and all associated mechanical & electrical. Install TiCl4 DTLR in F2M1 CSF and all associated mechanical & electrica

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12100 Samsung Blvd, Austin, TX, 78754

Loading location map…
30.37563, -97.63712

Related City Permits

Building permits found at or near this location

12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActivePlumbing PermitNewNov 2026
View Details
2026-131629 PP
Local Plumbing Service-DBA Crow's Plumbing Service
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveElectrical PermitNewNov 2026
View Details
2026-131629 EP
LED ES Electric
12100 RUSSO DR

ETJ Irrigation installation Ref: 2026-053796 W

FinalPlumbing PermitIrrigationOct 2026
View Details
2026-133145 PP
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveBuilding PermitNewOct 2026
View Details
2026-131629 BP
Austin Pool Builders
12100 SAMSUNG BLVD BLDG FAB1

Interior remodel existing light manufacturing facility - FAB1 TMAH Replacement - F126-CH01.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-119503 BP
Samsung Engineering and Construction America

Watch all construction in 78754 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.