Brewster County, TX Construction Projects

6 Cities · 81 Projects

81
Projects
$115.0M
Total Value
34
New Builds
47
Renovations
6
Cities
1.3M
Sq Ft

What is being built in Brewster County, Texas?

Brewster County, Texas has 81 construction and development projects on file worth $115.0M — 34 new construction and 47 renovations or remodels, spread across 6 cities and towns. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

Which cities in Brewster County have the most construction?

The most active cities for construction in Brewster County are Alpine (64 projects), Terlingua (4 projects), Marathon (2 projects), Big Bend National Pa (1 project), Study Butte (1 project). Counts reflect the filings on this page, so a city with a single large development can carry more value than one with more projects.

What new developments are coming to Brewster County?

The most recently filed new-construction projects in Brewster County are South Brewster County Emergency Response Center ($500K), FWTOboathouse ($140K), Los Arcos Hotel ($3.5M), Brewster County Courthouse Gazebo ($100K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens.

Brewster County Map

Project locations across the county

Brewster County Economy

Federal Reserve Economic Data (FRED)

2.9%↓
Unemployment Rate
6K
Labor Force
Available workers
-12.1%
Unemployment YoY
Improving
Brewster County economy: 2.9% unemployment with 6K labor force supporting 81 construction projects worth $115.0M.
2 New Projects in Last 6 Months
$640K in new investment
64
Closed
11
Review Complete
2
Registered
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 81 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Brewster County
Estimated construction value$115MSum of 68 shown records with value
Records in view81 / 81Ready to inspect and compare
Largest record’s share18.3%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect13 without reported value · Smaller records grouped
Brewster County

Comparisons use only these 81 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

All Projects

81 TDLR · 0 Site Plans

Showing 20 of 81 listed TDLR filings

Registered
$140K

FWTOboathouse

291 south cockrell st, Alpine, TX 79830

1,248 sqftSep 4, 2026
Review Complete
$3.5M

Los Arcos Hotel

Ave B and 2nd Street NE

27,508 sqftSep 5, 2025
Review Complete
$6.7M

Skyway Gardens P 2

Lechuguilla St, Alpine, TX 79830

47,605 sqftMar 8, 2024
Review Complete
$200K

Alpine

300 S Cockrell St., Alpine, TX 79830

600 sqftOct 2, 2023
Review Complete
$120K

Terlingua

45 Kempf Rd., Study Butte, TX 79852

900 sqftJul 25, 2023

Brewster County construction: common questions

How many construction projects are in Brewster County, Texas?
Brewster County has 81 registered construction projects worth $115.0M, covering 1,315,276 square feet of development. The average project is valued at $1.4M.
What kind of construction is happening in Brewster County?
Brewster County has 34 new construction projects (42%) and 47 renovation or remodel projects (58%) on file. Work spans commercial, residential, public and mixed-use development.
Who is building in Brewster County?
The property owners with the highest declared value on file in Brewster County are Alpine I.S.D. (Becky McCutchen), Texas State University System, The Texas State University System. The architecture and design firms appearing most often on Brewster County filings are Parkhill, Smith & Cooper, Inc. (Les Burke)sm, BRW Architects, Page Southerland Page, Inc..
Where does this Brewster County construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.