Project intelligenceTDLR TABS2024000708New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 118 (CSJ: 0358-02-031) in Alpine, TX

From: 1.33 MI S of RM 1837 To: Avenue E, Alpine, TX, 79830

Construction complete · Oct 2026Project Closed

SH 118 (CSJ: 0358-02-031) is a new construction project at From: 1.33 MI S of RM 1837 To: Avenue E, Alpine, in Brewster County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $204K across about 4,000 sq ft.

Estimated project value
$204K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$51/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 12, 20231,116 days across supplied datesOct 2, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    203 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    791 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 118 (CSJ: 0358-02-031)

The restoration of State Highway 118 in Alpine, Texas, is complete. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as SH 118 (Csj: 0358-02-031), involved new construction work on the roadway between 1.33 miles south of RM 1837 and Avenue E. The work covered 4,000 square feet of pavement and infrastructure, with an estimated cost of $203,633.

TxDOT District: El Paso served as the owner of record for this federally funded roadway project. The scope of work included the restoration of main lanes and shoulders, specifically involving milling, inlay, and overlay of the pavement. Additional components included new pavement markings, signage, curb ramps, and the replacement of the median barrier guard fence (MBGF).

Timeline and Completion

Construction began in April 2024, and the final inspection was passed in August 2024. This concluded the physical construction phase of the project. TDLR closed the project file in October 2026, marking the end of the accessibility review process for this construction. The scheduled build window was 122 days, which is shorter than the county median of 298 days for similar new construction filings in Brewster County.

The estimated cost per square foot for this project was $51, which is below the county median of $120 per square foot. The total estimated cost of $203,633 falls in the bottom quarter of costs for new construction projects registered in Brewster County. This project is one of several managed by TxDOT District: El Paso, which has six other TDLR-registered projects totaling nearly $99.9 million, ranging from Marfa to El Paso.

The project area is in Alpine, Brewster County, with a population of about 7,672 according to U.S. Census ACS 2023 estimates. The median household income in the 79830 ZIP code is $55,743. The completion of this highway segment restoration reflects the ongoing infrastructure maintenance in the region, ensuring the roadway meets current safety and accessibility standards.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79830 (Alpine)

One email per change. Unsubscribe in one click. Privacy.

SH 118 (CSJ: 0358-02-031) is a New Construction project located at From: 1.33 MI S of RM 1837 To: Avenue E, Alpine, TX 79830 in Alpine, Texas. The project has an estimated value of $204K covering 4,000 sq ft. TxDOT District: El Paso is the property owner. The project was registered with TDLR on September 12, 2023.

Frequently Asked Questions

Is the SH 118 project in Alpine finished?

Yes, the final inspection passed in August 2024. TDLR closed the project file in October 2026, confirming the completion of the accessibility review process.

Who owned the SH 118 restoration project?

TxDOT District: El Paso was the owner of record. The project involved public funds and is a Federally funded roadway project.

What work was done on SH 118?

The work included milling, inlay, and overlay of pavement, plus new markings, signs, curb ramps, and median barrier guard fence replacement.

How much did the project cost?

The estimated cost was $203,633. This is below the county median of $600,000 for new construction in Brewster County.

When did construction start and end?

Construction started in April 2024 and the final inspection passed in August 2024. The TDLR file was closed in October 2026.

What is SH 118 (CSJ: 0358-02-031)?

SH 118 (CSJ: 0358-02-031) is a new construction project at From: 1.33 MI S of RM 1837 To: Avenue E in Alpine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restoration of SH 118 main lanes and shoulders consisting of mill, inlay, overlay, pavement markings, signs, curb ramps and MBGF replacement.

Is SH 118 (CSJ: 0358-02-031) open in Alpine?

Construction on SH 118 (CSJ: 0358-02-031) is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is SH 118 (CSJ: 0358-02-031) located?

SH 118 (CSJ: 0358-02-031) is located at From: 1.33 MI S of RM 1837 To: Avenue E, Alpine, TX, 79830, in Brewster County.

Who is the owner or developer of SH 118 (CSJ: 0358-02-031)?

TxDOT District: El Paso is the property owner/developer of record for SH 118 (CSJ: 0358-02-031), per its TDLR project registration.

How much does SH 118 (CSJ: 0358-02-031) cost and how big is it?

SH 118 (CSJ: 0358-02-031) has an estimated construction value of $204K and approximately 4,000 square feet (about $51/sqft), based on its TDLR filing.

Scope of Work

Restoration of SH 118 main lanes and shoulders consisting of mill, inlay, overlay, pavement markings, signs, curb ramps and MBGF replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: 1.33 MI S of RM 1837 To: Avenue E, Alpine, TX, 79830

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79830 (Alpine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.