Property Owner3 not closed in shown records

Daikin

19001 Kermier Rd, Waller, Texas 77484
James Beitzel

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 11 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

11
Total Projects
$8.2M
Portfolio Value
3
Not closed · shown
685,022
Sq ft · shown
1
Cities · shown
$744K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Daikin files a new project.

Export full work history

Download Daikin's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Daikin

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Daikin

Daikin is named as an owner in 11 construction filings in the Houston area, with a reported portfolio value of $8.2M. The 11 loaded filings include 2 new construction records and 9 renovation/alteration records, representing 685,022 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (18%)
  • 9 renovation projects (82%)
  • Average disclosed value in shown filings: $744K
  • Square footage in shown records: 685,022 sq ft

Market Presence

  • Waller11 projects

Among these 11 loaded filings, 3 have a reported status other than Project Closed and 8 are marked Project Closed. The records cover 1 cities and name design firms including Inventure Design, Powers-Brown Architecture, Inventure. These are filing statuses, not independent observations of work on site.

Activity Over Time

2019
7
2020
2
2022
2
Median project: $800KAvg cost/sqft: $193/sqftPeak year: 2019 (7 projects)

Activity Timeline

First Project
Mar 2019
Latest Project
Sep 2022
3
Not closed
8
Source closed

Project Locations

Project Status

Closed
8(73%)
Review Complete
2(18%)
Inspection Complete
1(9%)