Permitted

Pearland Industrial Park-Bldg4

4420 Leading Edge Drive, Pearland, TX 77581, Pearland (Brazoria County)

TDLR Project: 7

Source coverage

7 linked records

Explore the filings behind this project.

How these records are linked

Record matching confidence: 85%. This describes the record association, not construction completion.

Reported project value
$15.9M
About this figure

The value recorded for this linked project. Filings may describe overlapping scopes, so this is not a final invoice or an appraisal.

Reported floor area
Not supplied
About this figure

Floor area associated with the linked project record. Open the source records to inspect each reported scope.

Site area
Not supplied
About this figure

The count or area provided by the linked records. Proposed figures may change as plans are revised.

Last recorded activity
Aug 6, 2026
About this figure

The latest activity date in this linked project record. It does not establish current work at the site.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 2026418 days across supplied datesMar 31, 2027

21 timeline dates shown.

  1. TDLR Project: Pearland Industrial Park-Bldg4 · TDLR Project · TABS2026011951

    Project Registered

    Source: TDLR Project · TABS2026011951

    View source record
  2. TDLR Project: Pearland Industrial Park- Bldg 3 · TDLR Project · TABS2026011949

    Project Registered

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011949

    View source record
  3. TDLR Project: Pearland Industrial Park-Building 6 · TDLR Project · TABS2026011944

    Project Registered

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011944

    View source record
  4. TDLR Project: Pearland Industrial Park-Building 1 · TDLR Project · TABS2026011941

    Project Registered

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011941

    View source record
  5. TDLR Project: Pearland Industrial Park-Building 7 · TDLR Project · TABS2026011947

    Project Registered

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011947

    View source record
  6. TDLR Project: Pearland Industrial Park- Bldg 2 · TDLR Project · TABS2026011942

    Project Registered

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011942

    View source record
Show 15 more dates
  1. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    23 days after the preceding date shown.

    Source: TDLR Project · TABS2026011951

    View source record
  2. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011949

    View source record
  3. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR Project · TABS2026011951

    View source record
  4. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011949

    View source record
  5. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR Project · TABS2026011944

    View source record
  6. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011947

    View source record
  7. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011942

    View source record
  8. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR Project · TABS2026011941

    View source record
  9. TDLR Project: Pearland Industrial Park Building 5 · TDLR Project · TABS2026027148

    Project Registered

    47 days after the preceding date shown.

    Source: TDLR Project · TABS2026027148

    View source record
  10. Construction Start · Scheduled date

    Projected start

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR Project · TABS2026027148

    View source record
  11. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR Project · TABS2026027148

    View source record
  12. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    89 days after the preceding date shown.

    Source: TDLR Project · TABS2026011941

    View source record
  13. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011947

    View source record
  14. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR Project · TABS2026011942

    View source record
  15. Expected Completion · Scheduled date

    Projected completion

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR Project · TABS2026011944

    View source record

Project Metrics

TDLR #TABS2026011951
$15.9M
Total Value
Started:Feb 6, 2026
Last activity:Aug 6, 2026
Duration:181 days

Location & views

4420 Leading Edge Drive, Pearland, TX 77581

Loading location map…
29.58000, -95.28776
Detailed source chronology
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park-Bldg4
TDLR Project • Project Registered
Valuation: $150K
Link confidence: 100%
Open record
February 6, 2026
TABS2026011951
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park- Bldg 3
TDLR Project • Project Registered
Valuation: $300K
Link confidence: 100%
Open record
February 6, 2026
TABS2026011949
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park-Building 6
TDLR Project • Project Registered
Valuation: $5.2M
Link confidence: 100%
Open record
February 6, 2026
TABS2026011944
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park-Building 1
TDLR Project • Project Registered
Valuation: $3.0M
Link confidence: 100%
Open record
February 6, 2026
TABS2026011941
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park-Building 7
TDLR Project • Project Registered
Valuation: $2.1M
Link confidence: 100%
Open record
February 6, 2026
TABS2026011947
2026
Feb 6
9 mos ago
TDLR Project: Pearland Industrial Park- Bldg 2
TDLR Project • Project Registered
Valuation: $2.7M
Link confidence: 100%
Open record
February 6, 2026
TABS2026011942
2026
Mar 1
8 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park-Bldg4
Start Mar 1, 2026→End Apr 30, 2026
Open record
March 1, 2026
TABS2026011951
2026
Mar 1
8 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park- Bldg 3
Start Mar 1, 2026→End Apr 30, 2026
Open record
March 1, 2026
TABS2026011949
2026
Apr 30
6 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park-Bldg4
Start Mar 1, 2026→End Apr 30, 2026
Open record
April 30, 2026
TABS2026011951
2026
Apr 30
6 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park- Bldg 3
Start Mar 1, 2026→End Apr 30, 2026
Open record
April 30, 2026
TABS2026011949
2026
Jun 1
5 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park-Building 6
Start Jun 1, 2026→End Mar 31, 2027
Open record
June 1, 2026
TABS2026011944
2026
Jun 1
5 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park-Building 7
Start Jun 1, 2026→End Feb 28, 2027
Open record
June 1, 2026
TABS2026011947
2026
Jun 1
5 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park- Bldg 2
Start Jun 1, 2026→End Feb 28, 2027
Open record
June 1, 2026
TABS2026011942
2026
Jun 20
5 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park-Building 1
Start Jun 20, 2026→End Feb 28, 2027
Open record
June 20, 2026
TABS2026011941
2026
Aug 6
3 mos ago
TDLR Project: Pearland Industrial Park Building 5
TDLR Project • Project Registered
Valuation: $2.5M
Link confidence: 100%
Open record
August 6, 2026
TABS2026027148
2026
Sep 1
2 mos ago
Construction Start
TDLR Project • Projected start
Work itemPearland Industrial Park Building 5
Start Sep 1, 2026→End Dec 1, 2026
Open record
September 1, 2026
TABS2026027148
2026
Dec 1
26 days from now
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park Building 5
Start Sep 1, 2026→End Dec 1, 2026
Open record
December 1, 2026
TABS2026027148
2027
Feb 28
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park-Building 1
Start Jun 20, 2026→End Feb 28, 2027
Open record
February 28, 2027
TABS2026011941
2027
Feb 28
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park-Building 7
Start Jun 1, 2026→End Feb 28, 2027
Open record
February 28, 2027
TABS2026011947
2027
Feb 28
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park- Bldg 2
Start Jun 1, 2026→End Feb 28, 2027
Open record
February 28, 2027
TABS2026011942
2027
Mar 31
5 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemPearland Industrial Park-Building 6
Start Jun 1, 2026→End Mar 31, 2027
Open record
March 31, 2027
TABS2026011944

Linked records by source

TDLR Projects (7)

Public source records
Pearland Industrial Park-Bldg4
Project Registered • Feb 6, 2026
TABS2026011951
Description: Interior finish out for existing PEMB building. Approx 27000sf
Facility: Building 4
Design firm: Method Architecture
Estimated cost: $150K
Sq Ft: 27,000
Pearland Industrial Park- Bldg 3
Project Registered • Feb 6, 2026
TABS2026011949
Description: Interior finish out for existing PEMB building. Approx 30000SF
Facility: Building 3
Design firm: Method Architecture
Estimated cost: $300K
Sq Ft: 30,000
Pearland Industrial Park-Building 6
Project Registered • Feb 6, 2026
TABS2026011944
Description: Ground up single story pemb tilt wall veneer approx 58,500sf
Facility: Building 6
Design firm: Method Architecture
Estimated cost: $5.2M
Sq Ft: 58,500
Pearland Industrial Park-Building 1
Project Registered • Feb 6, 2026
TABS2026011941
Description: Ground up single story pemb with tilt wall veneer approx 34,200sf
Facility: Building 1
Design firm: Method Architecture
Estimated cost: $3.0M
Sq Ft: 34,200
Pearland Industrial Park-Building 7
Project Registered • Feb 6, 2026
TABS2026011947
Description: Ground up, single story pemb tilt wall veneer approx 21,000sf
Facility: Building 7
Design firm: Method Architecture
Estimated cost: $2.1M
Sq Ft: 21,000
Pearland Industrial Park- Bldg 2
Project Registered • Feb 6, 2026
TABS2026011942
Description: Ground up, Single-story PEMB with Tilit wall veneer. Approx 30000SF
Facility: Building 2
Design firm: Method Architecture
Estimated cost: $2.7M
Sq Ft: 30,000
Pearland Industrial Park Building 5
Project Registered • Aug 6, 2026
TABS2026027148
Description: interior finish out for existing pemb building approx. 27,000sf
Facility: Building 5-Waygate
Design firm: Method Architecture
Estimated cost: $2.5M
Sq Ft: 27,000