Project intelligenceTDLR EABPRJB5821309New Construction
Funding type

This project is privately funded, on private land for private use.

STONEWATER SUBDIVISION PHASE 5

PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653

Construction complete · Mar 2016Project Closed

STONEWATER SUBDIVISION PHASE 5 is a new construction project at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $1.4M.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 5, 2015209 days across supplied datesMar 1, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78653 (Manor)

One email per change. Unsubscribe in one click. Privacy.

STONEWATER SUBDIVISION PHASE 5 is a New Construction project located at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX 78653 in Manor, Texas. The project has an estimated value of $1.4M. DR HORTON is the property owner and DOUCET AND ASSOCIATES is the design firm of record. The project was registered with TDLR on August 5, 2015.

Frequently Asked Questions

What is STONEWATER SUBDIVISION PHASE 5?

STONEWATER SUBDIVISION PHASE 5 is a new construction project at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd. in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: site preparation for Stonewater Subdivision Phase 5, construction of roadways,sidewalks,utilities and grading fo

Is STONEWATER SUBDIVISION PHASE 5 open in Manor?

Construction on STONEWATER SUBDIVISION PHASE 5 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.

Where is STONEWATER SUBDIVISION PHASE 5 located?

STONEWATER SUBDIVISION PHASE 5 is located at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653, in Travis County.

Who is the owner or developer of STONEWATER SUBDIVISION PHASE 5?

DR HORTON is the property owner/developer of record for STONEWATER SUBDIVISION PHASE 5, per its TDLR project registration.

Who is the architect or design firm for STONEWATER SUBDIVISION PHASE 5?

DOUCET AND ASSOCIATES is the design firm of record for STONEWATER SUBDIVISION PHASE 5, according to its TDLR filing.

How much does STONEWATER SUBDIVISION PHASE 5 cost and how big is it?

STONEWATER SUBDIVISION PHASE 5 has an estimated construction value of $1.4M, based on its TDLR filing.

Scope of Work

site preparation for Stonewater Subdivision Phase 5, construction of roadways,sidewalks,utilities and grading fo

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653

30.28786, -97.75614

Related City Permits

Building permits found at or near this location

2301 WINDSOR RD
Same location

Change-out HVAC to existing residence only.

FinalMechanical PermitRemodelAug 2013
View Details
2013-086270 MP
Petrocelli Services Inc.
2305 WINDSOR RD
107 ft away

Install EVSE in garage

FinalElectrical PermitSpecial Inspections ProgramMay 2021
View Details
2021-062668 EP
Grayzer Electric LLC
2215 WINDSOR RD
128 ft away

Replace siding on existing single-family residence. No other changes authorized under this permit.

FinalBuilding PermitRepairApr 2017
$6K
View Details
2017-039727 BP
Home Depot USA Inc
2302 WINDSOR RD
144 ft away

Replace sewer line in the yard replace the sewer line in the yard only.

WithdrawnPlumbing PermitRepairOct 2023
View Details
2023-127986 PP
Service Wizard
2302 WINDSOR RD
144 ft away

Replacement of complete existing central heat and air system with or without duct work

ExpiredMechanical PermitChange OutSep 2019
View Details
2019-181713 MP
All Year Heating & Cooling

Watch all construction in 78653 (Manor)