Funding type
This project is privately funded, on private land for private use.
STONEWATER SUBDIVISION PHASE 5
PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653
STONEWATER SUBDIVISION PHASE 5 is a new construction project at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $1.4M.
- Estimated project value
- $1.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
27 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
182 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78653 (Manor)
One email per change. Unsubscribe in one click. Privacy.
STONEWATER SUBDIVISION PHASE 5 is a New Construction project located at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX 78653 in Manor, Texas. The project has an estimated value of $1.4M. DR HORTON is the property owner and DOUCET AND ASSOCIATES is the design firm of record. The project was registered with TDLR on August 5, 2015.
Frequently Asked Questions
What is STONEWATER SUBDIVISION PHASE 5?
STONEWATER SUBDIVISION PHASE 5 is a new construction project at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd. in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: site preparation for Stonewater Subdivision Phase 5, construction of roadways,sidewalks,utilities and grading fo
Is STONEWATER SUBDIVISION PHASE 5 open in Manor?
Construction on STONEWATER SUBDIVISION PHASE 5 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.
Where is STONEWATER SUBDIVISION PHASE 5 located?
STONEWATER SUBDIVISION PHASE 5 is located at PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653, in Travis County.
Who is the owner or developer of STONEWATER SUBDIVISION PHASE 5?
DR HORTON is the property owner/developer of record for STONEWATER SUBDIVISION PHASE 5, per its TDLR project registration.
Who is the architect or design firm for STONEWATER SUBDIVISION PHASE 5?
DOUCET AND ASSOCIATES is the design firm of record for STONEWATER SUBDIVISION PHASE 5, according to its TDLR filing.
How much does STONEWATER SUBDIVISION PHASE 5 cost and how big is it?
STONEWATER SUBDIVISION PHASE 5 has an estimated construction value of $1.4M, based on its TDLR filing.
Scope of Work
site preparation for Stonewater Subdivision Phase 5, construction of roadways,sidewalks,utilities and grading fo
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
PARNELLA RD. CAMBRIAN ST. Carbrook Rd. Estuary Rd., Manor, TX, 78653
Related Projects
Same Owner
$744K totalNearby Projects
Within 1 kmRelated City Permits
Building permits found at or near this location
Change-out HVAC to existing residence only.
Install EVSE in garage
Replace siding on existing single-family residence. No other changes authorized under this permit.
Replace sewer line in the yard replace the sewer line in the yard only.
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78653 (Manor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Manor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.