Manor NTHS Phase-II Concession Stand Project
12125 Joyce Turner Road, Manor, TX, 78653
Manor NTHS Phase-II Concession Stand Project is a new construction project at 12125 Joyce Turner Road, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2021). The project has an estimated value of $2.2M across about 3,554 sq ft.
- Estimated project value
- $2.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,554 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $630/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 9 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
275 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78653 (Manor)
One email per change. Unsubscribe in one click. Privacy.
Manor NTHS Phase-II Concession Stand Project is a New Construction project located at 12125 Joyce Turner Road, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $2.2M covering 3,554 sq ft. Manor ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on June 11, 2020.
Frequently Asked Questions
What is Manor NTHS Phase-II Concession Stand Project?
Manor NTHS Phase-II Concession Stand Project is a new construction project at 12125 Joyce Turner Road in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct concessions stand with public restrooms and ticket sales window.
Is Manor NTHS Phase-II Concession Stand Project open in Manor?
Construction on Manor NTHS Phase-II Concession Stand Project is complete — TDLR records show the project passed its required accessibility inspection in Mar 2021. The building is finished and very likely open.
Where is Manor NTHS Phase-II Concession Stand Project located?
Manor NTHS Phase-II Concession Stand Project is located at 12125 Joyce Turner Road, Manor, TX, 78653, in Travis County.
Who is the owner or developer of Manor NTHS Phase-II Concession Stand Project?
Manor ISD is the property owner/developer of record for Manor NTHS Phase-II Concession Stand Project, per its TDLR project registration.
Who is the architect or design firm for Manor NTHS Phase-II Concession Stand Project?
Claycomb Associates, Architects is the design firm of record for Manor NTHS Phase-II Concession Stand Project, according to its TDLR filing.
How much does Manor NTHS Phase-II Concession Stand Project cost and how big is it?
Manor NTHS Phase-II Concession Stand Project has an estimated construction value of $2.2M and approximately 3,554 square feet (about $630/sqft), based on its TDLR filing.
Scope of Work
Construct concessions stand with public restrooms and ticket sales window.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12125 Joyce Turner Road, Manor, TX, 78653
Related Projects
Same Owner
$188.9M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Upgrade of existing overhead service to 200 amp 120/240 single phase to current codes and standards
Repaired Prv in yard
Replace Overhead Service 200 Amp Main panel and Meter Base/Riser
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78653 (Manor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Manor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.