911 N. Longview St., Kilgore, TX, 75662
Kilgore High School is a new construction project at 911 N. Longview St., Kilgore, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $89.0M across about 250,154 sq ft.
- Estimated project value
- $89.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 250,154 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $356/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
974 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Kilgore High School
Kilgore ISD is building a new 250,154 sq ft high school facility at 911 N. Longview St. in Kilgore, Gregg County. The project is a new construction effort with an estimated cost of $89,000,000. This scale places the development significantly above the typical commercial or residential filings in the region, reflecting a major institutional investment in the local education infrastructure.
The design firm of record is Claycomb Associates, Architects, a practice that has registered several other large-scale educational and civic projects across Texas. The registered accessibility specialist for this filing is Waldemar Tirado. The project utilizes public funds and is situated on public land, ensuring that the facility serves the broader community of Kilgore and surrounding areas in Gregg County.
Project Scale and County Context
In comparison to other new construction filings in Gregg County, this project stands out for its size and cost. The median estimated cost for new construction in the county is $800,000, with a median size of 6,565 sq ft. The Kilgore High School project, at $89,000,000 and over 250,000 sq ft, is in the top quarter of cost and exceeds the median size by a substantial margin. The cost per square foot is $356, which is above the county median of $159 per square foot.
The scheduled build window for this project was 974 days, which is longer than the county median of 213 days. This extended timeline is consistent with the complexity of constructing a full high school facility, which includes specialized rooms, athletic spaces, and administrative offices.
Current Status and Timeline
TDLR completed plan review in November 2022, and construction was scheduled to begin in December 2022 with a completion date of August 2025. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project status is listed as Review Complete, indicating that the regulatory approval process for the design has been finalized, but the physical completion of the building remains unverified in the TDLR database.
Local web mentions, such as a post on the Kilgore High School website, express excitement about opening the doors to the new facility. USNews.com ranks the school within Texas, noting opportunities for Advanced Placement coursework. These third-party sources suggest anticipation for the new building, but the official TDLR record does not confirm that the construction is finished or that the school is operational.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75662 (Kilgore)
One email per change. Unsubscribe in one click. Privacy.
Kilgore High School is a New Construction project located at 911 N. Longview St., Kilgore, TX 75662 in Kilgore, Texas. The project has an estimated value of $89.0M covering 250,154 sq ft. Kilgore ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on November 3, 2022.
Frequently Asked Questions
Is the new Kilgore High School open for classes?
TDLR has not yet recorded a final inspection, so the official construction status is unconfirmed. While the school website expresses excitement about opening, the public record does not verify that the building is complete or operational.
Who designed the new Kilgore High School?
Claycomb Associates, Architects is the design firm of record. They have also worked on other large educational projects in Texas, including Fairfield High School and Needville High School.
How much did the new Kilgore High School cost to build?
The estimated cost of the project is $89,000,000. This figure is significantly higher than the median new construction cost in Gregg County, which is $800,000.
When was the project registered with TDLR?
The project was registered with TDLR in November 2022. Plan review was completed in the same month, and construction was scheduled to start in December 2022.
Is the site in a flood zone?
It is designated as zone X on the FEMA National Flood Hazard Layer.
What is Kilgore High School?
Kilgore High School is a new construction project at 911 N. Longview St. in Kilgore, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New high school facility.
Is Kilgore High School open in Kilgore?
Kilgore High School was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Kilgore High School located?
Kilgore High School is located at 911 N. Longview St., Kilgore, TX, 75662, in Gregg County.
Who is the owner or developer of Kilgore High School?
Kilgore ISD is the property owner/developer of record for Kilgore High School, per its TDLR project registration.
Who is the architect or design firm for Kilgore High School?
Claycomb Associates, Architects is the design firm of record for Kilgore High School, according to its TDLR filing.
How much does Kilgore High School cost and how big is it?
Kilgore High School has an estimated construction value of $89.0M and approximately 250,154 square feet (about $356/sqft), based on its TDLR filing.
Scope of Work
New high school facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
911 N. Longview St., Kilgore, TX, 75662
Related Projects
Same Owner
$132.0M totalWatch all construction in 75662 (Kilgore)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Kilgore?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.