SAS 2022 Capital Projects - Stormwater Pond Improvements
๐Project Metrics
TDLR #TABS2024000658Project Closed
Project has been completed and closed
๐Scope of Work
Install underground tank and necessary equipment that would capture any accidental leak or spill that would otherwise enter the pond. Piping will also be run to our industrial wastewater treatment system to treat the any contaminated water.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.7M total๐Related City Permits
Building permits found at or near this location
Cap Off W/WW
Demolition of an office building metal shop building three storage structures and a pole barn totaling approximately 3809 sq. ft. Circa 1972 2025 130394 DA - Approved ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged.
Addition & Remodel for 1-story single family residence. Interior remodel inlcludes new windows & doors throughout the structure new flex space room half bath & laundry room. Addition of covered rear porch over existing slab. 4 bed 2.5 bath.
Construction of steel canopies over approximately 1112 existing parking spaces. (Reactivated after revision expanded the scope of project)