AISD Blazier Intermediate School - Second Floor Finish Out
8801 Vertex Blvd., Austin, TX, 78744
AISD Blazier Intermediate School - Second Floor Finish Out is a renovation/alteration project at 8801 Vertex Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $2.2M across about 8,529 sq ft.
- Estimated project value
- $2.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 8,529 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $258/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
46 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
212 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78744 (Austin)
One email per change. Unsubscribe in one click. Privacy.
AISD Blazier Intermediate School - Second Floor Finish Out is a Renovation/Alteration project located at 8801 Vertex Blvd., Austin, TX 78744 in Austin, Texas. The project has an estimated value of $2.2M covering 8,529 sq ft. Austin Independent School District is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on October 16, 2023.
Frequently Asked Questions
What is AISD Blazier Intermediate School - Second Floor Finish Out?
AISD Blazier Intermediate School - Second Floor Finish Out is a renovation/alteration project at 8801 Vertex Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out in 900 wing on second floor.
Is AISD Blazier Intermediate School - Second Floor Finish Out open in Austin?
Construction on AISD Blazier Intermediate School - Second Floor Finish Out is complete — TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is AISD Blazier Intermediate School - Second Floor Finish Out located?
AISD Blazier Intermediate School - Second Floor Finish Out is located at 8801 Vertex Blvd., Austin, TX, 78744, in Travis County.
Who is the owner or developer of AISD Blazier Intermediate School - Second Floor Finish Out?
Austin Independent School District is the property owner/developer of record for AISD Blazier Intermediate School - Second Floor Finish Out, per its TDLR project registration.
Who is the architect or design firm for AISD Blazier Intermediate School - Second Floor Finish Out?
Fuse Architecture Studio is the design firm of record for AISD Blazier Intermediate School - Second Floor Finish Out, according to its TDLR filing.
How much does AISD Blazier Intermediate School - Second Floor Finish Out cost and how big is it?
AISD Blazier Intermediate School - Second Floor Finish Out has an estimated construction value of $2.2M and approximately 8,529 square feet (about $258/sqft), based on its TDLR filing.
Scope of Work
Finish out in 900 wing on second floor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8801 Vertex Blvd., Austin, TX, 78744
Related Projects
Same Owner
$2.13B totalRelated City Permits
Building permits found at or near this location
Replace interior hot and cold water lines with Uponor PEX pipe. Replace main water line from city lead to home. Install owner su[pplied hot water heater
Express: Siding repair
ETJ. Replace existing electrical service panel with a new panel of the same rating. No change to existing service capacity.
Home Depot
Our scope of work includes performing a direct access drain repair in the garage to correct a damaged section of the underground sanitary drain line. We will saw cut and remove approximately a 3 x 3 section of the garage concrete slab to safely expose the affected piping below. Once the drain line is exposed we will remove the damaged 45-degree fitting that has been compromised by root intrusion. The defective fitting will be cut out and replaced with new approved PVC fittings and pipe to restore the integrity of the drainage system. All new connections will be properly aligned solvent welded and installed in accordance with current plumbing code standards. After the repair is complete we will perform a static water test on the drain system to verify the repair is watertight and free of leaks. The system will remain under test for the required plumbing inspection. Once the repair has successfully passed inspection we will backfill the excavation with suitable material compact the soil as needed and patch the garage concrete to restore the slab. This estimate includes the plumbing repair concrete removal and replacement backfilling testing and cleanup of the work area. Any additional repairs required due to unforeseen conditions or the discovery of additional damaged piping outside the original scope will be discussed with the homeowner prior to proceeding.
Watch all construction in 78744 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.