Project intelligenceTDLR TABS2024008807Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Secure Vestibule at Guerrero Thompson Elementary School

102 E Rundberg Lane, Austin, TX, 78753

Construction complete · Aug 2024Project Closed

Secure Vestibule at Guerrero Thompson Elementary School is a renovation/alteration project at 102 E Rundberg Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $113K across about 1,365 sq ft.

Estimated project value
$113K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,365 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$83/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 9, 2024235 days across supplied datesAug 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    113 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78753 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Secure Vestibule at Guerrero Thompson Elementary School is a Renovation/Alteration project located at 102 E Rundberg Lane, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $113K covering 1,365 sq ft. Austin Independent School District is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on January 9, 2024.

Frequently Asked Questions

What is Secure Vestibule at Guerrero Thompson Elementary School?

Secure Vestibule at Guerrero Thompson Elementary School is a renovation/alteration project at 102 E Rundberg Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of new secure vestibule at main entrance of school.

Is Secure Vestibule at Guerrero Thompson Elementary School open in Austin?

Construction on Secure Vestibule at Guerrero Thompson Elementary School is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is Secure Vestibule at Guerrero Thompson Elementary School located?

Secure Vestibule at Guerrero Thompson Elementary School is located at 102 E Rundberg Lane, Austin, TX, 78753, in Travis County.

Who is the owner or developer of Secure Vestibule at Guerrero Thompson Elementary School?

Austin Independent School District is the property owner/developer of record for Secure Vestibule at Guerrero Thompson Elementary School, per its TDLR project registration.

Who is the architect or design firm for Secure Vestibule at Guerrero Thompson Elementary School?

Fuse Architecture Studio is the design firm of record for Secure Vestibule at Guerrero Thompson Elementary School, according to its TDLR filing.

How much does Secure Vestibule at Guerrero Thompson Elementary School cost and how big is it?

Secure Vestibule at Guerrero Thompson Elementary School has an estimated construction value of $113K and approximately 1,365 square feet (about $83/sqft), based on its TDLR filing.

Scope of Work

Addition of new secure vestibule at main entrance of school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

102 E Rundberg Lane, Austin, TX, 78753

Location by street address

Related City Permits

Building permits found at or near this location

10210 SPICEWOOD MESA

Routing new gas line to fixture 40

ActivePlumbing PermitRepairOct 2026
View Details
2026-128212 PP
Reliant Plumbing
10206 LA COSTA DR

Install new 13.5kw energy storage system & replacement of 1 energy storage system with second 13.5kW ess for existing residential only.

ActiveElectrical PermitAuxiliary PowerOct 2026
View Details
2026-116755 EP
Freedom Solar Power
10215 DIANELLA LN

Level 2 EV Charger

ActiveElectrical PermitRepairOct 2026
View Details
2026-119327 EP
Faraday Electric
10204 MEDINAH GREENS DR

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutOct 2026
View Details
2026-127199 MP
ABC Home and Commercial Services
1021 W BRAKER LN

Removal of underground fuel storage tank and installation of an above ground fuel storage tank. UST Permit to be applied for through the COA UST department.

ActiveBuilding PermitRemodelOct 2026
View Details
2026-123764 BP
Excell Fueling Systems

Watch all construction in 78753 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.