Project has been completed and closed
Secure Vestibule at Guerrero Thompson Elementary School is a Renovation/Alteration project located at 102 E Rundberg Lane, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $113K covering 1,365 sq ft. Austin Independent School District is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on January 9, 2024.
Secure Vestibule at Guerrero Thompson Elementary School is a renovation/alteration project at 102 E Rundberg Lane, Austin, TX 78753 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of new secure vestibule at main entrance of school.
Construction on Secure Vestibule at Guerrero Thompson Elementary School is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Secure Vestibule at Guerrero Thompson Elementary School is located at 102 E Rundberg Lane, Austin, TX 78753, Austin, TX, 78753, in Travis County.
Austin Independent School District is the property owner/developer of record for Secure Vestibule at Guerrero Thompson Elementary School, per its TDLR project registration.
Fuse Architecture Studio is the design firm of record for Secure Vestibule at Guerrero Thompson Elementary School, according to its TDLR filing.
Secure Vestibule at Guerrero Thompson Elementary School has an estimated construction value of $113K and approximately 1,365 square feet (about $83/sqft), based on its TDLR filing.
Addition of new secure vestibule at main entrance of school.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 9, 2024
Review Complete
Inspection Complete
Closed
Aug 31, 2024
Building permits found at or near this location
200amp OH services build
Replacement of an existing water heater *Shari Curtis: Replace two existing 40-gallon gas water heaters with new Bradford White units adding new expansion tanks and drain pans; no structural change.
Replacement of complete existing central heat and air system with or without duct work *Shari Curtis: Replace existing 3.5-ton horizontal gas HVAC system like-for-like; no structural change.
New portable and flatwork. 2026 067974 DA - Approved.
Install (1) Tesla wall connector from the outside main panel through the attic and back down into the left side of the garage location.