Project intelligenceTDLR TABS2025002764New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 157 (CSJ: 0747-05-042, etc.) in Venus, TX

From: US 67 To: N of CR 1088, Venus, TX, 76084

Opening ~Feb 2027Review Complete

FM 157 (CSJ: 0747-05-042, etc.) is a new construction project at From: US 67 To: N of CR 1088, Venus, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $16.7M across about 16,111 sq ft.

Estimated project value
$16.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,111 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.04K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 8, 2024868 days across supplied datesFeb 23, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    419 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    449 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FM 157 (CSJ: 0747-05-042, etc.)

The project identified as CSJ: 0747-05-042, etc. involves the construction of a new two-lane urban roadway along FM 157 in Venus, Texas. The Texas Department of Transportation is the owner of record for this $16,696,013 development. The work transforms the existing rural road into an urban standard, adding sidewalks, turn lanes, and traffic signals. Construction is scheduled to finish in February 2027, with work starting in December 2025.

Located from US 67 to north of CR 1088 in Johnson County, the project covers an estimated 16,111 sq ft. The scope includes paving, grading, drainage, signing, pavement markings, ADA curb ramps, and illumination. The computed cost of $1036 per sq ft is above the county median of $132 per sq ft for new construction filings. The total estimated cost places this project in the top quarter of recent filings in Johnson County.

Design and Regulatory Status

Michael Baker International serves as the design firm of record. Frank Fonseca is the registered accessibility specialist. The project was registered with TDLR in October 2024, and plan review was completed in the same month. The current TDLR status is Review Complete. Funding involves public funds, public land, or Federally funded roadway project sources, underscoring the public nature of this infrastructure investment.

The scheduled build window is 449 days, which is longer than the county median of 220 days for similar projects. This duration reflects the complexity of realigning the roadway and installing comprehensive urban amenities.

Local Context

Venus has a population of about 13,645, with a median household income of $100,174. The median owner-occupied home value is $248,800, and housing is predominantly owner-occupied. Nearby businesses include Melody Morrow, Midwife, Mike's Mechanic Shop, and Extreme Custom Fabrication. Other registered projects in the area include Elliott Electric Supply and Costco Wholesale Warehouse, indicating ongoing development in the region.

TxDOT District: Fort Worth has six other TDLR-registered projects totaling $3,529,565. Michael Baker International has six other TDLR-registered projects totaling $2,300,000. This project is a significant addition to the local infrastructure portfolio, with a cost and scale that exceed the typical new construction filings in Johnson County. The Johnson County unemployment rate was 4.1 percent in August 2026, lower than a year earlier, providing a stable economic backdrop for the construction period.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76084 (Venus)

One email per change. Unsubscribe in one click. Privacy.

FM 157 (CSJ: 0747-05-042, etc.) is a New Construction project located at From: US 67 To: N of CR 1088, Venus, TX 76084 in Venus, Texas. The project has an estimated value of $16.7M covering 16,111 sq ft. TxDOT District: Fort Worth is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on October 8, 2024.

Frequently Asked Questions

What is the project name or ID for the FM 157 roadway work?

The project is identified as CSJ: 0747-05-042, etc. It is also referred to as FM 157 in the filing documents. The owner of record is TxDOT District: Fort Worth.

When is the construction scheduled to be completed?

The project is scheduled to finish in February 2027. Construction is set to start in December 2025, following the completion of plan review in October 2024.

Who is the design firm for this project?

Michael Baker International is the design firm of record. Frank Fonseca is the registered accessibility specialist listed in the TDLR filing.

What is the estimated cost and size of the project?

The estimated cost is $16,696,013. The project size is 16,111 sq ft, resulting in a computed cost of $1036 per sq ft. This is above the county median cost per square foot.

Is the site located in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer, indicating it is not in a high-risk flood area.

What is FM 157 (CSJ: 0747-05-042, etc.)?

FM 157 (CSJ: 0747-05-042, etc.) is a new construction project at From: US 67 To: N of CR 1088 in Venus, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct and realign roadway from two-lane rural to two-lane urban with sidewalks and turn lanes. Consisting of: paving, grading, drainage, signing, pavement markings, ADA curb ramps, traffic signals and illumination.

Is FM 157 (CSJ: 0747-05-042, etc.) open in Venus?

FM 157 (CSJ: 0747-05-042, etc.) is still under construction in Venus, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is FM 157 (CSJ: 0747-05-042, etc.) located?

FM 157 (CSJ: 0747-05-042, etc.) is located at From: US 67 To: N of CR 1088, Venus, TX, 76084, in Johnson County.

Who is the owner or developer of FM 157 (CSJ: 0747-05-042, etc.)?

TxDOT District: Fort Worth is the property owner/developer of record for FM 157 (CSJ: 0747-05-042, etc.), per its TDLR project registration.

Who is the architect or design firm for FM 157 (CSJ: 0747-05-042, etc.)?

Michael Baker International is the design firm of record for FM 157 (CSJ: 0747-05-042, etc.), according to its TDLR filing.

How much does FM 157 (CSJ: 0747-05-042, etc.) cost and how big is it?

FM 157 (CSJ: 0747-05-042, etc.) has an estimated construction value of $16.7M and approximately 16,111 square feet (about $1.04K/sqft), based on its TDLR filing.

Scope of Work

Construct and realign roadway from two-lane rural to two-lane urban with sidewalks and turn lanes. Consisting of: paving, grading, drainage, signing, pavement markings, ADA curb ramps, traffic signals and illumination.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: US 67 To: N of CR 1088, Venus, TX, 76084

Loading location map…
32.37661, -97.35686

Watch all construction in 76084 (Venus)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.