Dollar General
Dollar General is a new construction project at 1600 Bunton Creek Road, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 10,286 sq ft.
๐Project Metrics
TDLR #TABS2025002853Review Complete
Design review complete, construction may proceed
Dollar General is a New Construction project located at 1600 Bunton Creek Road, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.0M covering 10,286 sq ft. Dollar General is the property owner and CASCO is the design firm of record. The project was registered with TDLR on October 9, 2024.
โFrequently Asked Questions
What is Dollar General?
Dollar General is a new construction project at 1600 Bunton Creek Road in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: One story, Pre-engineered metal building, mercantile.
Is Dollar General open in Kyle?
Dollar General is currently under construction in Kyle, TX. Its current TDLR status is "Review Complete".
Where is Dollar General located?
Dollar General is located at 1600 Bunton Creek Road, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Dollar General?
Dollar General is the property owner/developer of record for Dollar General, per its TDLR project registration.
Who is the architect or design firm for Dollar General?
CASCO is the design firm of record for Dollar General, according to its TDLR filing.
How much does Dollar General cost and how big is it?
Dollar General has an estimated construction value of $1.0M and approximately 10,286 square feet (about $97/sqft), based on its TDLR filing.
๐Scope of Work
One story, Pre-engineered metal building, mercantile.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 9, 2024
Review Complete
Oct 9, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.4M total๐๏ธSame Design Firm
$283.3M total๐Related City Permits
Building permits found at or near this location
Express: Removal of tub vanity and bathroom flooring. Installation of new walk in shower flooring pedestal sink and toilet.
Express: Removal of tub vanity and bathroom flooring. Installation of new walk in shower flooring pedestal sink and toilet.
240v Tesla EV Charger installation from the main panel to the garage back-to-back because the main panel and garage share the same wall.
Excavate 20 tunnel to repair the main drain line under the house
Replacement of complete existing central heat and air system with or without duct work
Property Owner
Design Firm
Registered Accessibility Specialist
Hays County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays