Farmersville Intermediate School Additions & Renovations

807 N Main SSt, Farmersville, TX, 75442

Construction complete · Jun 2026Inspection Complete

Farmersville Intermediate School Additions & Renovations is a additions to existing building project at 807 N Main SSt, Farmersville, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $9.0M across about 10,300 sq ft.

Estimated project value
$9.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,300 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$874/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 23, 2025513 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    368 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Farmersville Intermediate School Additions & Renovations

The Farmersville Intermediate School Additions & Renovations project at 807 N Main St in Farmersville is complete, having passed its final TDLR accessibility inspection in June 2026. This $9,000,000 expansion adds 10,300 square feet to the existing school facility, specifically constructing a new classroom wing and renovating current spaces. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in January 2025, with plan review completed in the same month before construction began in May 2025.

Project Scope and Financials

Farmersville ISD served as the owner of record for this significant infrastructure investment. The estimated cost of $9,000,000 translates to $874 per square foot, a figure that places this project in the top quarter of estimated costs for similar additions to existing buildings in Collin County. For context, the median estimated cost for such filings in the county is $487,620, while the median size is 4,047 square feet. This project’s scheduled build window of 368 days was also longer than the county median of 153 days for comparable work.

Claycomb Associates, Architects was the design firm of record, bringing experience from other major projects including Fairfield High School and Needville High School. Phillip Bertram Chapman served as the registered accessibility specialist. The project utilized public funds and was located on public land, ensuring compliance with federal and state accessibility standards.

Farmersville ISD has six other TDLR-registered projects totaling $101,720,000, including the Lakehaven Elementary School and Farmersville High School. These investments reflect a broader district commitment to modernizing educational facilities in Collin County. The area profile for ZIP code 75442 indicates a population of about 10,567, with a median household income of $84,591 and a median owner-occupied home value of $330,000 according to U.S. Census ACS 2023 five-year estimates.

Local businesses near the site include Dairy Queen, Valero, and El Encanto Taqueria 2. The completion of this classroom wing addition supports the educational needs of the community, adding substantial capacity and updated facilities. The project closed with a final inspection in June 2026, marking the end of the construction phase for this specific filing.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75442 (Farmersville)

One email per change. Unsubscribe in one click. Privacy.

Farmersville Intermediate School Additions & Renovations is a Additions to Existing Building project located at 807 N Main SSt, Farmersville, TX 75442 in Farmersville, Texas. The project has an estimated value of $9.0M covering 10,300 sq ft. Farmersville ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on January 23, 2025.

Frequently Asked Questions

Is the construction finished?

Yes, the project passed its final TDLR accessibility inspection in June 2026, confirming that construction is complete.

Who designed the school additions?

Claycomb Associates, Architects was the design firm of record for the Farmersville Intermediate School Additions & Renovations.

Is the school open?

The TDLR record confirms construction completion in June 2026, but does not provide information on business opening dates or operational status.

What was the scope of work?

The scope included a classroom wing addition and renovations to the existing school facility.

What is Farmersville Intermediate School Additions & Renovations?

Farmersville Intermediate School Additions & Renovations is a additions to existing building project at 807 N Main SSt in Farmersville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Classroom wing addition and renovations to an existing school facility.

Is Farmersville Intermediate School Additions & Renovations open in Farmersville?

Construction on Farmersville Intermediate School Additions & Renovations is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Farmersville Intermediate School Additions & Renovations located?

Farmersville Intermediate School Additions & Renovations is located at 807 N Main SSt, Farmersville, TX, 75442, in Collin County.

Who is the owner or developer of Farmersville Intermediate School Additions & Renovations?

Farmersville ISD is the property owner/developer of record for Farmersville Intermediate School Additions & Renovations, per its TDLR project registration.

Who is the architect or design firm for Farmersville Intermediate School Additions & Renovations?

Claycomb Associates, Architects is the design firm of record for Farmersville Intermediate School Additions & Renovations, according to its TDLR filing.

How much does Farmersville Intermediate School Additions & Renovations cost and how big is it?

Farmersville Intermediate School Additions & Renovations has an estimated construction value of $9.0M and approximately 10,300 square feet (about $874/sqft), based on its TDLR filing.

Scope of Work

Classroom wing addition and renovations to an existing school facility.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

807 N Main SSt, Farmersville, TX, 75442

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75442 (Farmersville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Farmersville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.