Project intelligenceTDLR TABS2025013027New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SL 485 (CSJ: 3290-02-008) in Gladewater, TX

From: US 271 To: US 80, Gladewater, TX, 75647

Opening ~Sep 2028Review Complete

SL 485 (CSJ: 3290-02-008) is a new construction project at From: US 271 To: US 80, Gladewater, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2028. The project has an estimated value of $2.0M across about 118,122 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
118,122 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$17/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 28, 20251,308 days across supplied datesSep 28, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,096 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SL 485 (CSJ: 3290-02-008)

Texas Department of Transportation District Tyler is widening State Loop 485 in Gladewater, a project registered with TDLR under case number Csj: 3290-02-008. The work involves expanding the roadway from two lanes to four lanes with a flush median, adding shared-use paths, sidewalks, curb ramps, and crosswalks. The estimated cost for this new construction is $1,996,298, covering 118,122 sq ft of development.

The project is scheduled to finish in September 2028, with construction beginning in September 2025. TDLR completed the plan review in February 2025, clearing the path for the multi-year build. This timeline reflects a scheduled build window of 1,096 days, which is longer than the county median of 213 days for similar new construction filings in Gregg County.

Project Scope and Design

BGE, Inc. is the design firm of record for this infrastructure improvement. The scope is strictly defined by the filing as widening the highway to accommodate increased traffic volume while enhancing pedestrian and bicycle safety. The addition of curb ramps and crosswalks indicates a focus on accessibility and safe crossings for all users. The registered accessibility specialist for the project is Frank Fonseca, ensuring compliance with state standards during the design and construction phases.

The estimated cost of $1,996,298 places this project above the median estimated cost of $800,000 for new construction filings in Gregg County. However, the cost per square foot is $17, which is below the county median of $160 per square foot. This discrepancy is typical for linear roadway projects where the linear footage and earthwork costs dominate the budget rather than interior build-out costs associated with commercial structures.

Local Context and Funding

The project is located in ZIP code 75647, which has an estimated population of 13,457 and a median household income of $61,356 according to U.S. Census ACS 2023 five-year estimates. The area is predominantly owner-occupied, with a median home value of $164,300. TxDOT District Tyler has six other TDLR-registered projects totaling $90,972,975, including a $85,200,000 project in Tyler and a $948,782 project in Gladewater, indicating a significant portfolio of infrastructure investments in the region.

Funding for this project involves public funds, public land, or Federal support, as it is a Federally funded roadway project. The Gregg County unemployment rate was 5.1 percent in August 2026, lower than a year earlier, suggesting a stable labor market for the construction workforce. The project’s status is Review Complete, meaning all necessary regulatory approvals have been secured prior to the start of physical construction.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75647 (Gladewater)

One email per change. Unsubscribe in one click. Privacy.

SL 485 (CSJ: 3290-02-008) is a New Construction project located at From: US 271 To: US 80, Gladewater, TX 75647 in Gladewater, Texas. The project has an estimated value of $2.0M covering 118,122 sq ft. TxDOT District: Tyler is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on February 28, 2025.

Frequently Asked Questions

What is the scope of the SL 485 project in Gladewater?

The project widens two lanes to four lanes with a flush median. It also includes shared-use paths, sidewalks, curb ramps, and crosswalks to improve safety and accessibility for pedestrians and cyclists.

When will construction on the US 271 to US 80 stretch start and end?

Construction is scheduled to start in September 2025 and is scheduled to finish in September 2028. This three-year window allows for the extensive earthwork and infrastructure installation required for the widening.

Who is the owner and design firm for this highway project?

The owner of record is TxDOT District Tyler. The design firm of record is BGE, Inc., which is responsible for the engineering plans that passed TDLR review in February 2025.

How does the cost per square foot compare to other projects in Gregg County?

The cost is $17 per square foot, which is below the county median of $160 per square foot. This lower rate is common for roadway projects where the total square footage metric does not reflect the true cost drivers like paving and drainage.

Is the business or facility open to the public?

This is a public roadway project, not a private business. The road is in the pre-construction phase, with work starting in September 2025. The project is not open for use in its final configuration until completion.

What is SL 485 (CSJ: 3290-02-008)?

SL 485 (CSJ: 3290-02-008) is a new construction project at From: US 271 To: US 80 in Gladewater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: WIDEN 2 LANES TO 4 LANES WITH FLUSH MEDIAN, SHARED-USE PATH, SIDEWALKS, CURB RAMPS AND CROSSWALKS.

Is SL 485 (CSJ: 3290-02-008) open in Gladewater?

SL 485 (CSJ: 3290-02-008) is still under construction in Gladewater, TX, with an estimated completion of Sep 2028 according to its TDLR registration.

Where is SL 485 (CSJ: 3290-02-008) located?

SL 485 (CSJ: 3290-02-008) is located at From: US 271 To: US 80, Gladewater, TX, 75647, in Gregg County.

Who is the owner or developer of SL 485 (CSJ: 3290-02-008)?

TxDOT District: Tyler is the property owner/developer of record for SL 485 (CSJ: 3290-02-008), per its TDLR project registration.

Who is the architect or design firm for SL 485 (CSJ: 3290-02-008)?

BGE, Inc. is the design firm of record for SL 485 (CSJ: 3290-02-008), according to its TDLR filing.

How much does SL 485 (CSJ: 3290-02-008) cost and how big is it?

SL 485 (CSJ: 3290-02-008) has an estimated construction value of $2.0M and approximately 118,122 square feet (about $17/sqft), based on its TDLR filing.

Scope of Work

WIDEN 2 LANES TO 4 LANES WITH FLUSH MEDIAN, SHARED-USE PATH, SIDEWALKS, CURB RAMPS AND CROSSWALKS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: US 271 To: US 80, Gladewater, TX, 75647

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75647 (Gladewater)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Gladewater?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.