SAS FAB2 TEOS Infrastructure - Phase 2 in Austin, TX

12100 Samsung Blvd, Austin, TX, 78754

Construction complete · Aug 2026Inspection Complete

SAS FAB2 TEOS Infrastructure - Phase 2 is a renovation/alteration project at 12100 Samsung Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $600K across about 250 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.40K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 2025488 days across supplied datesAug 9, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    360 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SAS FAB2 TEOS Infrastructure - Phase 2

Samsung Austin Semiconductor completed a targeted infrastructure upgrade at 12100 Samsung Blvd in Travis County, installing two WF6 gas cabinets and associated piping within the FAB2 FSF gas bunker. The project, filed as SAS FAB2 TEOS Infrastructure - Phase 2, involved a renovation and alteration of 250 square feet with an estimated cost of $600,000.

Project Scope and Status

The work focused on specialized industrial gas systems rather than general building expansion. The scope was limited to the installation of the gas cabinets and necessary piping within the existing FAB2 facility. This specific infrastructure project passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete and the TDLR status is Inspection Complete.

Samsung, the owner of record, engaged Fuse Architecture Studio as the design firm. Mark S Robinson served as the registered accessibility specialist for the filing. The project was privately funded on private land for private use. Plan review and construction start were both recorded in April 2025, with a scheduled completion date of August 2025.

Local Context and Comparisons

At $600,000, the estimated cost is above the county median of $299,975 for renovation and alteration projects in Travis County. The cost per square foot stands at $2,400, which is above the county median of $103 per square foot. The scheduled build window of 122 days is close to the county median of 98 days. This project is one of several TDLR-registered filings by Samsung in the area, which has six other projects totaling $5,841,700.

City of Austin permit records show at least 25 permits on file at this street address, with the 25 most recent issued between September 2024 and September 2026. These include electrical, building, plumbing, and mechanical permits with total declared valuations of $9,981,475. The area profile for ZIP 78754 indicates a population of about 31,410 and a median household income of $92,964 according to U.S. Census ACS 2023 estimates.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78754 (Austin)

One email per change. Unsubscribe in one click. Privacy.

SAS FAB2 TEOS Infrastructure - Phase 2 is a Renovation/Alteration project located at 12100 Samsung Blvd, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $600K covering 250 sq ft. Samsung is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on April 8, 2025.

Frequently Asked Questions

What specific work was done at this Samsung facility?

The project involved the installation of two WF6 gas cabinets and associated piping within the FAB2 FSF gas bunker. This was a renovation and alteration project focused on industrial gas infrastructure.

Is the construction complete?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is listed as Inspection Complete, confirming that the construction phase is finished.

Who is the design firm for this project?

Fuse Architecture Studio is the design firm of record for this Samsung Austin Semiconductor project. Mark S Robinson served as the registered accessibility specialist.

What is the estimated cost of the project?

The estimated cost for the installation of the gas cabinets and piping was $600,000. This figure is above the Travis County median for similar renovation and alteration projects.

Where is this project located?

The project is located at 12100 Samsung Blvd, Austin, TX 78754, in the Samsung-Pioneer Crossing area of Travis County.

What is SAS FAB2 TEOS Infrastructure - Phase 2?

SAS FAB2 TEOS Infrastructure - Phase 2 is a renovation/alteration project at 12100 Samsung Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of (2) WF6 gas cabinets and associated piping within the FAB2 FSF gas bunker.

Is SAS FAB2 TEOS Infrastructure - Phase 2 open in Austin?

Construction on SAS FAB2 TEOS Infrastructure - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is SAS FAB2 TEOS Infrastructure - Phase 2 located?

SAS FAB2 TEOS Infrastructure - Phase 2 is located at 12100 Samsung Blvd, Austin, TX, 78754, in Travis County.

Who is the owner or developer of SAS FAB2 TEOS Infrastructure - Phase 2?

Samsung is the property owner/developer of record for SAS FAB2 TEOS Infrastructure - Phase 2, per its TDLR project registration.

Who is the architect or design firm for SAS FAB2 TEOS Infrastructure - Phase 2?

Fuse Architecture Studio is the design firm of record for SAS FAB2 TEOS Infrastructure - Phase 2, according to its TDLR filing.

How much does SAS FAB2 TEOS Infrastructure - Phase 2 cost and how big is it?

SAS FAB2 TEOS Infrastructure - Phase 2 has an estimated construction value of $600K and approximately 250 square feet (about $2.40K/sqft), based on its TDLR filing.

Scope of Work

Installation of (2) WF6 gas cabinets and associated piping within the FAB2 FSF gas bunker.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12100 Samsung Blvd, Austin, TX, 78754

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActivePlumbing PermitNewNov 2026
View Details
2026-131629 PP
Local Plumbing Service-DBA Crow's Plumbing Service
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveElectrical PermitNewNov 2026
View Details
2026-131629 EP
LED ES Electric
12100 RUSSO DR

ETJ Irrigation installation Ref: 2026-053796 W

FinalPlumbing PermitIrrigationOct 2026
View Details
2026-133145 PP
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveBuilding PermitNewOct 2026
View Details
2026-131629 BP
Austin Pool Builders
12100 SAMSUNG BLVD BLDG FAB1

Interior remodel existing light manufacturing facility - FAB1 TMAH Replacement - F126-CH01.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-119503 BP
Samsung Engineering and Construction America

Watch all construction in 78754 (Austin)