City of Keller Sidewalk Additions Project

City of Keller Public Right of Way, Keller, TX, 76244

Construction complete · Sep 2026Project Closed

City of Keller Sidewalk Additions Project is a new construction project at City of Keller Public Right of Way, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $210K across about 7,690 sq ft.

Estimated project value
$210K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,690 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$27/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 7, 2025392 days across supplied datesSep 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    277 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76244 (Keller)

One email per change. Unsubscribe in one click. Privacy.

City of Keller Sidewalk Additions Project is a New Construction project located at City of Keller Public Right of Way, Keller, TX 76244 in Keller, Texas. The project has an estimated value of $210K covering 7,690 sq ft. City of Keller is the property owner and Neel-Schaffer ,Inc. is the design firm of record. The project was registered with TDLR on August 7, 2025.

Frequently Asked Questions

What is City of Keller Sidewalk Additions Project?

City of Keller Sidewalk Additions Project is a new construction project at City of Keller Public Right of Way in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new sidewalks and ramps at multiple locations throughout the City of Keller's public right-of-way area is estimated at 7,690 SF

Is City of Keller Sidewalk Additions Project open in Keller?

Construction on City of Keller Sidewalk Additions Project is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is City of Keller Sidewalk Additions Project located?

City of Keller Sidewalk Additions Project is located at City of Keller Public Right of Way, Keller, TX, 76244, in Tarrant County.

Who is the owner or developer of City of Keller Sidewalk Additions Project?

City of Keller is the property owner/developer of record for City of Keller Sidewalk Additions Project, per its TDLR project registration.

Who is the architect or design firm for City of Keller Sidewalk Additions Project?

Neel-Schaffer ,Inc. is the design firm of record for City of Keller Sidewalk Additions Project, according to its TDLR filing.

How much does City of Keller Sidewalk Additions Project cost and how big is it?

City of Keller Sidewalk Additions Project has an estimated construction value of $210K and approximately 7,690 square feet (about $27/sqft), based on its TDLR filing.

Scope of Work

Installation of new sidewalks and ramps at multiple locations throughout the City of Keller's public right-of-way area is estimated at 7,690 SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76244 (Keller)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists