Kitchen Replacement Project
๐Project Metrics
TDLR #TABS2026008491Review Complete
Design review complete, construction may proceed
๐Scope of Work
Replacement of existing walk in cooler / freezer and associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work 3.5 Ton Gas Furnace Horizontal System + New supply plenum.
Building 2 Garage Apartment 1/1
Building 1 2870 sf 2 story single family residence. 3 Bdrm 3.5 Bath pool and spa. Detached 2 car garage with 503 sf one bedroom one bath residence on the second floor
Overhead Homebuilder Loop Ref: 2026-002369
Building 1 2870 sf 2 story single family residence. 3 Bdrm 3.5 Bath pool and spa. Detached 2 car garage with 503 sf one bedroom one bath residence on the second floor