Project intelligenceTDLR TABS2026008495Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Kitchen Replacement Project in Cedar Park, TX

2302 LAKELINE BLVD N, Cedar Park, TX, 78613

Opening ~Dec 2026Review Complete

Kitchen Replacement Project is a renovation/alteration project at 2302 LAKELINE BLVD N, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $196K across about 250 sq ft.

Estimated project value
$196K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$785/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 18, 2025378 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    343 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Kitchen Replacement Project

Running Brush Middle School in Cedar Park is undergoing a specific renovation focused on the kitchen infrastructure. The project, filed as the Kitchen Replacement Project, involves the replacement of existing walk-in cooler and freezer units along with serving line equipment. This work includes associated mechanical, electrical, and plumbing updates, as well as minor architectural patch and repair resulting from the equipment changes.

The construction site is located at 2302 Lakeline Blvd N in Cedar Park, Williamson County. The estimated cost for this renovation is $196,143. While the total square footage affected is 250 sq ft, the cost per square foot computes to $785. This figure is above the county median of $95 per square foot for similar renovation and alteration filings. The total project cost is below the Williamson County median of $250,000 for this type of work.

Project Timeline and Status

Leander Independent School District is the owner of record for this project. O'Connell Robertson serves as the design firm. Kathy Ann Riley is the registered accessibility specialist. The project was registered with TDLR in December 2025. Plan review was completed in January 2026. Construction is scheduled to finish in December 2026, with work starting in January 2026. The TDLR status is Review Complete.

This project involves public funds, public land, or is a Federally funded roadway project. The scheduled build window is 351 days, which is longer than the county median of 92 days for similar projects. Leander Independent School District has six other TDLR-registered projects totaling $2,709,915. These include Giddens Elementary School, Faubion Elementary School, and Cypress Elementary School, all in Cedar Park with an estimated cost of $484,343 each.

O'Connell Robertson has six other TDLR-registered projects totaling $40,984,222. These include Lasa HS in Austin with an estimated cost of $21,330,000 and Frost Financial Center in Mont Belvieu with an estimated cost of $3,500,000. The area profile for ZIP code 78613 indicates a population of about 89,162. The median household income is $120,829. The median owner-occupied home value is $461,900. These are U.S. Census ACS 2023 five-year estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78613 (Cedar Park)

One email per change. Unsubscribe in one click. Privacy.

Kitchen Replacement Project is a Renovation/Alteration project located at 2302 LAKELINE BLVD N, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $196K covering 250 sq ft. Leander Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 18, 2025.

Frequently Asked Questions

What is the scope of the renovation at Running Brush Middle School?

The work involves replacing existing walk-in cooler and freezer units and serving line equipment. It also includes associated mechanical, electrical, and plumbing updates, plus minor architectural patch and repair.

Who is the owner and design firm for this project?

Leander Independent School District is the owner of record. O'Connell Robertson is the design firm of record. Kathy Ann Riley is the registered accessibility specialist.

When is the construction scheduled to finish?

Construction is scheduled to finish in December 2026. Work started in January 2026. Plan review was completed in January 2026.

What is the estimated cost of the project?

The estimated cost is $196,143. The affected square footage is 250 sq ft, resulting in a cost per square foot of $785.

Is the school open for construction work?

The TDLR record indicates construction is scheduled to finish in December 2026. The status is Review Complete. No specific opening date for the renovated kitchen is provided in the filing.

What is Kitchen Replacement Project?

Kitchen Replacement Project is a renovation/alteration project at 2302 LAKELINE BLVD N in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.

Is Kitchen Replacement Project open in Cedar Park?

Kitchen Replacement Project is still under construction in Cedar Park, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Kitchen Replacement Project located?

Kitchen Replacement Project is located at 2302 LAKELINE BLVD N, Cedar Park, TX, 78613, in Williamson County.

Who is the owner or developer of Kitchen Replacement Project?

Leander Independent School District is the property owner/developer of record for Kitchen Replacement Project, per its TDLR project registration.

Who is the architect or design firm for Kitchen Replacement Project?

O'Connell Robertson is the design firm of record for Kitchen Replacement Project, according to its TDLR filing.

How much does Kitchen Replacement Project cost and how big is it?

Kitchen Replacement Project has an estimated construction value of $196K and approximately 250 square feet (about $785/sqft), based on its TDLR filing.

Scope of Work

Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2302 LAKELINE BLVD N, Cedar Park, TX, 78613

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

2302 MC CULLOUGH ST

New pool/spa with plumbing permit

ActiveBuilding PermitNewOct 2026
View Details
2026-136807 BP
Cody Pools, Inc. **MAIN
2302 MC CULLOUGH ST

New Construction of a 2 story single-family residence with attached 1-car carport covered outdoor living space with sink counter fireplace and two habitable attics: one on the second floor and the other habitable attic on the third floor . 4 bedroom 5.5 bathroom

ActivePlumbing PermitNewOct 2026
View Details
2026-136806 PP
Christianson Plumbing
2302 MC CULLOUGH ST

New detached garage and second floor habitable attic room accessed via spiral staircase. 1 bathroom in habitable attic.

ActiveBuilding PermitNewOct 2026
View Details
2026-136808 BP
Foster Howard Design Build LLC
2302 MC CULLOUGH ST

New Construction of a 2 story single-family residence with attached 1-car carport covered outdoor living space with sink counter fireplace and two habitable attics: one on the second floor and the other habitable attic on the third floor . 4 bedroom 5.5 bathroom

ActiveBuilding PermitNewOct 2026
View Details
2026-136806 BP
Foster Howard Design Build LLC
2302 MC CULLOUGH ST

New detached garage and second floor habitable attic room accessed via spiral staircase. 1 bathroom in habitable attic.

ActivePlumbing PermitNewOct 2026
View Details
2026-136808 PP
Christianson Plumbing

Watch all construction in 78613 (Cedar Park)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cedar Park?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.