Dollar Tree
Dollar Tree is a renovation/alteration project at 1801 West Parmer Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2026. The project has an estimated value of $736K across about 14,571 sq ft.
๐Project Metrics
TDLR #TABS2026010664Review Complete
Design review complete, construction may proceed
Dollar Tree is a Renovation/Alteration project located at 1801 West Parmer Lane, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $736K covering 14,571 sq ft. Helena MT Associates is the property owner and CASCO is the design firm of record. The project was registered with TDLR on January 22, 2026.
โFrequently Asked Questions
What is Dollar Tree?
Dollar Tree is a renovation/alteration project at 1801 West Parmer Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing tenant retail space.
Is Dollar Tree open in Austin?
Dollar Tree is still under construction in Austin, TX, with an estimated completion of Jul 2026 according to its TDLR registration.
Where is Dollar Tree located?
Dollar Tree is located at 1801 West Parmer Lane, Austin, TX, 78727, in Travis County.
Who is the owner or developer of Dollar Tree?
Helena MT Associates is the property owner/developer of record for Dollar Tree, per its TDLR project registration.
Who is the architect or design firm for Dollar Tree?
CASCO is the design firm of record for Dollar Tree, according to its TDLR filing.
How much does Dollar Tree cost and how big is it?
Dollar Tree has an estimated construction value of $736K and approximately 14,571 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing tenant retail space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 22, 2026
Review Complete
May 1, 2026
Inspection Complete
Closed
99d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$3.0M total๐Related City Permits
Building permits found at or near this location
Express- Replace siding around house exterior and around electrical box. Electrical Permit
Addition/ remodel of existing 1-story single-family residential to include: rear addition of bedroom study 1 bath utility room mud room covered rear patio and two uncovered wood deck steps. Complete interior remodel of existing structure.
QT - Replacment of three sliding glass doors for a residential unit. Each door unit has two fixed and one operable panel. Specification sheet is included for reference. - OVA
Temporary Power for the Lake Travis Church of Christ NO BP [ETJ] [AE ]
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [3bed 3.5bath] with Autofill Pool. Unit A